INSTALLATION
Removal / installation · Vehicles built from Jan 2017
| 1. INSTALL NO. 2 COOLING FAN MOTOR |
Install the No. 2 cooling fan motor to the fan shroud with the 5 screws.
- Torque:
- 3.9 N*m{ 40 kgf*cm , 34 in.*lbf }
| 2. INSTALL NO. 1 COOLING FAN MOTOR |
Install the No. 1 cooling fan motor to the fan shroud with the 5 screws.
- Torque:
- 3.9 N*m{ 40 kgf*cm , 34 in.*lbf }
| 3. INSTALL NO. 2 FAN |
Install the No. 2 fan to the No. 2 cooling fan motor with the 3 screws.
- Torque:
- 3.9 N*m{ 40 kgf*cm , 34 in.*lbf }
| 4. INSTALL NO. 1 FAN |
Install the No. 1 fan to the cooling fan motor with the 3 screws.
- Torque:
- 3.9 N*m{ 40 kgf*cm , 34 in.*lbf }
| 5. INSTALL FAN BRACKET SUB-ASSEMBLY |
Install the fan bracket sub-assembly with the 2 bolts and 2 nuts.
- Torque:
- 20 N*m{ 199 kgf*cm , 14 ft.*lbf }
Attach the clamp.
| 6. CONNECT OIL COOLER HOSE |
Connect the 2 oil cooler hoses to the 2 oil cooler tubes, and slide the 2 hose clamps to secure the hoses.
Attach the 2 clamps and connect the oil cooler hose to the fan shroud.
| 7. INSPECT AUTOMATIC TRANSMISSION FLUID LEVEL |
| 8. INSPECT FOR FLUID LEAK |
