INSTALLATION
Removal / installation · Vehicles built from Oct 2014
| 1. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 2 diesel throttle body connectors.
w/o DPF:
Install the wire harness clamp with the bolt.
- Torque:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
Connect the diesel turbo pressure sensor connector and vacuum switching valve connector.
| 2. INSTALL NO. 4 AIR HOSE |
Install the No. 4 air hose and tighten the 2 hose clamps.
- Torque:
- 6.0 N*m{ 61 kgf*cm , 53 in.*lbf }
| 3. CONNECT VANE PUMP OIL RESERVOIR ASSEMBLY |
Connect the vane pump oil reservoir with the 2 bolts.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
| 4. PERFORM DIESEL THROTTLE BODY INITIALIZATION |
- w/ DPF: (Click here)
- w/o DPF: (Click here)
