2014-2019 Hiace · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Oct 2014


1. INSTALL DIESEL THROTTLE BODY ASSEMBLY
  1. Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 diesel throttle body connectors.

  1. w/o DPF:

    1. Install the wire harness clamp with the bolt.

      Torque:
      9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

    2. Connect the diesel turbo pressure sensor connector and vacuum switching valve connector.


2. INSTALL NO. 4 AIR HOSE
  1. Install the No. 4 air hose and tighten the 2 hose clamps.

    Torque:
    6.0 N*m{ 61 kgf*cm , 53 in.*lbf }


3. CONNECT VANE PUMP OIL RESERVOIR ASSEMBLY
  1. Connect the vane pump oil reservoir with the 2 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


4. PERFORM DIESEL THROTTLE BODY INITIALIZATION
  1. w/ DPF: (Click here)
  2. w/o DPF: (Click here)
← REMOVAL (from Oct 2014)COMPONENTS (from Oct 2014) →