2014-2019 Hiace · Service Manual ENGINE

REMOVAL

Removal / installation · Vehicles built from Oct 2014

NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
  3. After removing the injection pipes, clean them with a brush and compressed air.


1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

2. CHECK FOR INJECTOR COMPENSATION CODE

HINT:
If the injector compensation code is not correctly registered, it may cause malfunctions.

  1. Read the injector compensation code (Click here).

  1. Check that the compensation code of the installed injector is the same as the code registered in the ECM. If the code is not as specified, register the injector compensation code of the injector (Click here).


3. REMOVE EGR COOLER ASSEMBLY
(Click here)

4. REMOVE FUEL INLET PIPE SUB-ASSEMBLY

  1. A177108E01
    Remove the bolt and No. 2 injection pipe clamp.

  1. Remove the bolt and detach the No. 1 injection pipe clamp.

    NOTICE:
    If a No. 1 injection pipe clamp is removed from the fuel inlet pipe, replace the No. 1 injection pipe clamp with a new one.

  1. A177109
    Using a 17 mm union nut wrench, loosen the union nuts and remove the fuel inlet pipe.


5. REMOVE VACUUM SWITCHING VALVE BRACKET

  1. A177110
    Disconnect the vacuum switching valve connector and 2 vacuum hoses.

  1. Remove the bolt and vacuum switching valve bracket.


6. REMOVE NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY

  1. A177111
    Disconnect the 3 fuel hoses.

  1. A177112E01
    Remove the union bolt, 3 bolts, No. 2 nozzle leakage pipe and gasket.


7. REMOVE INJECTION PIPE SUB-ASSEMBLY

  1. A239564
    Disconnect the 4 injector connectors.

  1. Remove the 4 bolts and detach the 3 clamps.

  1. A151629
    Remove the 2 bolts and 2 No. 2 injection pipe clamps.

  1. A151628
    Using a 17 mm union nut wrench, loosen the union nuts and remove the 4 injection pipes.


8. REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A060180E01
    Using a small screwdriver, remove the nozzle holder seal by prying the portion between the nozzle holder seal and the cutout part of the cylinder head cover.

  1. Disconnect the ventilation hose.

  1. A151616
    Remove the 10 bolts, 2 nuts, cylinder head cover and the cylinder head cover gasket.

  1. A289511
    Remove the 4 No. 3 cylinder head cover gaskets from the cylinder head cover.


9. REMOVE INJECTOR ASSEMBLY

  1. A076779E02
    Remove the union bolt, 4 injector hollow screws, 5 gaskets and nozzle leakage pipe.

    NOTICE:
    1. When removing the nozzle leakage pipe, place a cushion under the pipe.
    2. Be careful not to deform or scratch the union seal surface.
    3. After removing the fuel pipe, put it in a plastic bag to prevent foreign matter from contaminating its injector inlet.

  1. A076780E01
    Remove the 4 bolts, 4 washers, 4 No. 1 nozzle holder clamps and 4 injectors.

    HINT:
    Arrange the injectors, No. 1 nozzle holder clamps, washers and bolts in the correct order.

  1. Remove the O-ring from each injector.

  1. Remove the 4 injection nozzle seats from the cylinder head.

← COMPONENTS (from Oct 2014)INSPECTION (from Oct 2014) →