Home › Engine / Hybrid System › 7GR-FKS (EMISSION CONTROL) › AIR SWITCHING VALVE (w/ Secondary Air Injection System) › 2019.02–2019.06
RM35X0E _51 Engine / Hybrid System _079025 7GR-FKS EMISSION CONTROL _0383275 AIR SWITCHING VALVE(w/ Secondary Air Injection System) A

7GR-FKS EMISSION CONTROL  AIR SWITCHING VALVE(w/ Secondary Air Injection System)  INSTALLATION  


PROCEDURE

Hide 1.INSTALL AIR SWITCHING VALVE ASSEMBLY

a.

for LH Side:

i.

Using an E8 "TORX" socket wrench, temporarily install the air switching valve assembly with the 2 stud bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


ii.

Install the air switching valve assembly with the 2 nuts and bolt.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


iii.

Attach the clamp and connect the No. 1 fuel pipe sub-assembly and No. 2 fuel pipe sub-assembly to the intake air surge tank assembly.


iv.

Connect the No. 3 air tube to the air switching valve assembly and slide the clip to secure it.


v.

Connect the air switching valve assembly connector.



b.

for RH Side:

i.

Install the air switching valve assembly with the 3 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


ii.

Connect the air tube to the air switching valve assembly and slide the clip to secure it.


iii.

Connect the air switching valve assembly connector.



Hide 5.INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Hide 17751 6.INSTALL NO. 1 AIR CLEANER INLET

Hide 53106B 7.INSTALL RADIATOR COVER SUB-ASSEMBLY

Hide 11209 8.INSTALL V-BANK COVER SUB-ASSEMBLY (w/ Cover)