Home › Engine / Hybrid System › 7GR-FKS (INTAKE / EXHAUST) › INTAKE MANIFOLD
RM35X0E _51 Engine / Hybrid System _079308 7GR-FKS INTAKE / EXHAUST _0385725 INTAKE MANIFOLD A

7GR-FKS INTAKE / EXHAUST  INTAKE MANIFOLD  INSTALLATION  


PROCEDURE

Hide 17111 1.INSTALL INTAKE MANIFOLD

a.
A437887

Set 2 new No. 1 intake manifold to head gaskets on each cylinder head as shown in the illustration.

NOTICE:
·

Align the port holes of the gasket and cylinder head sub-assembly and cylinder head LH.

·

Be careful of the installation direction.




b.

Set the intake manifold on the cylinder head sub-assembly and cylinder head LH.


c.

Install and uniformly tighten the 4 bolts and 4 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 23800 2.INSTALL FUEL DELIVERY WITH SENSOR PIPE ASSEMBLY

Hide 17190 3.INSTALL INTAKE AIR SURGE TANK ASSEMBLY

NOTICE:

Do not apply oil to the bolts and nuts as listed below:

Oil Application Prohibited Bolt and Nut
Bolt and Nut for Intake Air Surge Tank Assembly and Intake Manifold


a.

Install a new air surge tank to intake manifold gasket to the intake air surge tank assembly.


b.

Set the intake air surge tank assembly on the intake manifold.


c.

Install and uniformly tighten the 5 bolts and 2 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


d.

Connect the PCV hose to the intake air surge tank assembly, and slide the clamp to secure the hose.


e.

Connect the intake air control valve actuator connector to the intake air control valve actuator.


f.

Install the 2 bolts to connect the engine wire to the intake air surge tank assembly.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


g.

Attach the clamp to connect the No. 1 fuel pipe sub-assembly and No. 2 fuel pipe sub-assembly.


h.

Connect the fuel vapor feed hose to the purge VSV, and slide the clamp to secure the hose.


i.

Attach the clamp to the intake air surge tank assembly.


j.

Attach the 2 wire harness clamps and connect the purge VSV connector to the purge VSV.


k.

Connect the No. 4 water by-pass hose and No. 5 water by-pass hose to the throttle body with motor assembly, and slide the 2 clamps to secure the hoses.


l.

Connect the throttle body with motor assembly connector.


Hide 22267A 5.INSTALL THROTTLE BODY BRACKET

a.

Install the throttle body bracket to the timing chain or belt cover sub-assembly and intake air surge tank assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

w/ Secondary Air Injection System:

Install the air tube assembly to the throttle body bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 17125 6.INSTALL NO. 1 SURGE TANK STAY

a.

Install the No. 1 surge tank stay to the cylinder head LH and intake air surge tank assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

Attach the 2 wire harness clamps and install the wire harness with the bolt.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


Hide 17126 7.INSTALL NO. 2 SURGE TANK STAY

a.

Install the No. 2 surge tank stay to the cylinder head LH and intake air surge tank assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

for Manual Transmission:

i.

Install the flexible hose bracket to intake air surge tank assembly with the bolt.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


ii.

w/o Secondary Air Injection System:

Install the clutch pipe clamp to the No. 2 surge tank stay and clutch hose bracket with the bolt and nut.

Torque:
13.5 N*m (138 kgf*cm, 10 ft.*lbf)


iii.

w/ Secondary Air Injection System:

Install the clutch pipe clamp to the No. 2 surge tank stay with the bolt.

Torque:
13.5 N*m (138 kgf*cm, 10 ft.*lbf)



Hide 55701J 8.INSTALL COWL TOP OUTER PANEL SUB-ASSEMBLY

Hide 85110 9.INSTALL WINDSHIELD WIPER MOTOR ASSEMBLY

Hide 17881 10.INSTALL NO. 1 AIR CLEANER HOSE

a.
A436920C01
2.865,3.344 3.063,3.25 true 0.385,4.375 0.563,4.156 true 0.854,2.927 1.167,3.083 0.313,0.156 10 false *a 0.115,3.656 0.427,3.813 0.313,0.156 10 false *b 0.25,4.354 0.563,4.51 0.313,0.156 10 false *c 2.427,2.927 2.74,3.083 0.313,0.156 10 false *a 1.729,3.656 2.042,3.813 0.313,0.156 10 false *b 3.094,3.135 3.406,3.292 0.313,0.156 10 false *c
*a Upper
*b Front Side
*c Stopper


Install the No. 1 air cleaner hose with the 2 hose clamps.

Torque:
4.0 N*m (41 kgf*cm, 35 in.*lbf)

HINT:

Make sure the hose clamp is oriented as shown in the illustration.



b.

Connect the No. 2 PCV hose to the No. 1 air cleaner hose, and slide the clamp to secure the hose.


Hide 11209 11.INSTALL V-BANK COVER SUB-ASSEMBLY (w/ Cover)

Hide 12.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 13. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART


Hide 14.BLEED CLUTCH PIPE LINE (for Manual Transmission)

Hide 31301 15.INSPECT AND ADJUST CLUTCH PEDAL SUB-ASSEMBLY (for Manual Transmission)

Hide 16.ADD ENGINE COOLANT

Hide 51405A 19.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY

Hide 52618 20.INSTALL LOWER FRONT BUMPER ABSORBER

Hide 51406A 21.INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ No. 2 Engine Under Cover Sub-assembly)