Home › Power Source / Network › NETWORKING › NETWORK GATEWAY ECU › 2019.02–2019.06
RM35X0E _57 Power Source / Network _078518 NETWORKING _0383482 NETWORK GATEWAY ECU A

NETWORKING  NETWORK GATEWAY ECU  INSTALLATION  


PROCEDURE

Hide 89111 1.INSTALL NETWORK GATEWAY ECU

a.

for LHD:

i.
E415070

Connect the connector and install the network gateway ECU.


ii.
E415069

Attach the guide and connect the network gateway ECU to the instrument panel reinforcement assembly.


iii.

Install the nut.

Torque:
5.5 N*m (56 kgf*cm, 49 in.*lbf)



b.

for RHD:

i.
E415072

Connect the connector and install the network gateway ECU.


ii.
E415071

Attach the guide and connect the network gateway ECU to the instrument panel reinforcement assembly.


iii.

Install the nut.

Torque:
5.5 N*m (56 kgf*cm, 49 in.*lbf)



Hide 83100 2.INSTALL COMBINATION METER ASSEMBLY

Hide 3.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 4. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART