The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the diesel throttle body assembly removal/installation are shown below.
12601B
1.REMOVE NO. 1 ENGINE COVER SUB-ASSEMBLY
Remove the 2 nuts from the No. 1 engine cover bracket and No. 2 engine cover bracket.
Detach the 2 clips and No. 1 engine cover sub-assembly from the No. 2 water by-pass pipe.
Make sure to lift the No. 1 engine cover sub-assembly upward. Pulling the No. 1 engine cover sub-assembly towards you may damage the No. 1 engine cover sub-assembly.
51406A
2.REMOVE NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ No. 2 Engine Under Cover Sub-assembly)
52618
3.REMOVE LOWER FRONT BUMPER ABSORBER
51405A
4.REMOVE NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
25761B
5.DISCONNECT NO. 1 VACUUM TRANSMITTING HOSE
17303T
6.REMOVE AIR PIPE SUB-ASSEMBLY
26100G
7.REMOVE DIESEL THROTTLE BODY ASSEMBLY
Disconnect the intake air temperature sensor connector.
Remove the bolt and disconnect the fuel hose bracket from the diesel throttle body assembly.
for Cold Area Specification Vehicles:
Slide the 2 clips and disconnect the No. 11 water by-pass hose and No. 14 water by-pass hose from the diesel throttle body assembly.
Disconnect the connector and clamp.
Remove the 4 bolts, intake air connector, diesel throttle body assembly and 2 gaskets.
Disconnect the connector to remove the emission control valve wire from the diesel throttle body assembly.