26100G
1.INSTALL DIESEL THROTTLE BODY ASSEMBLY
Connect the connector to install the emission control valve wire to the diesel throttle body assembly.
Install new 2 gaskets and the diesel throttle body assembly and intake air connector with the 4 bolts.
| *a | Claw |
The claws of the 2 gaskets must face the diesel throttle body assembly side shown in the illustration.
Connect the connector and clamp.
for Cold Area Specification Vehicles:
Connect the No. 11 water by-pass hose and No. 14 water by-pass hose to the diesel throttle body assembly, and slide the 2 clips to secure the hose.
Connect the fuel hose bracket with the bolt to the diesel throttle body assembly.
Connect the intake air temperature sensor connector.
17303T
2.INSTALL AIR PIPE SUB-ASSEMBLY
25761B
3.INSTALL NO. 1 VACUUM TRANSMITTING HOSE
51405A
4.INSTALL NO. 1 ENGINE UNDER COVER SUB-ASSEMBLY
52618
5.INSTALL LOWER FRONT BUMPER ABSORBER
51406A
6.INSTALL NO. 2 ENGINE UNDER COVER SUB-ASSEMBLY (w/ No. 2 Engine Under Cover Sub-assembly)
12601B
7.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
Attach the 2 clips and install the No. 1 engine cover sub-assembly to the No. 2 water by-pass pipe.
Install the No. 1 engine cover sub-assembly to the No. 1 engine cover bracket and No. 2 engine cover bracket with the 2 nuts.
8.PERFORM INITIALIZATION
w/ Urea SCR System:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ Urea SCR System)>INITIALIZATION
w/ EGR Cooler:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/ EGR Cooler)>INITIALIZATION
w/o EGR Cooler:
Click hereEngine / Hybrid System>1GD-FTV (ENGINE CONTROL)>ECD SYSTEM (w/o EGR Cooler)>INITIALIZATION