Home › Engine / Hybrid System › 7GR-FKS (EMISSION CONTROL) › AIR SWITCHING VALVE (w/ Secondary Air Injection System) › from 2019.06
RM35X0E _51 Engine / Hybrid System _079025 7GR-FKS EMISSION CONTROL _0383275 AIR SWITCHING VALVE(w/ Secondary Air Injection System) A

7GR-FKS EMISSION CONTROL  AIR SWITCHING VALVE(w/ Secondary Air Injection System)  REMOVAL  


PROCEDURE

Hide 11209 1.REMOVE V-BANK COVER SUB-ASSEMBLY (w/ Cover)

Hide 17751 3.REMOVE NO. 1 AIR CLEANER INLET

Hide 4.REMOVE AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Hide 17125 5.REMOVE NO. 1 SURGE TANK STAY

Hide 8.REMOVE AIR SWITCHING VALVE ASSEMBLY

a.

for RH Side:

i.
A437963

Disconnect the air switching valve assembly connector.


ii.

Slide the clip and disconnect the air tube from the air switching valve assembly.


iii.
A437964

Remove the 3 nuts and air switching valve assembly.



b.

for LH Side:

i.
A437965

Disconnect the air switching valve assembly connector.


ii.

Slide the clip and disconnect the No. 3 air tube from the air switching valve assembly.


iii.
A436924

Detach the clamp and disconnect the No. 1 fuel pipe sub-assembly and No. 2 fuel pipe sub-assembly from intake air surge tank assembly.


iv.
A437966

Remove the 2 nuts and bolt.


v.
A438033

Using an E8 "TORX" socket wrench, remove the 2 stud bolts and air switching valve assembly.