Home › Steering › POWER ASSIST SYSTEMS › VANE PUMP (for 1GD-FTV(w/ Variable Flow Control Solenoid Valve)) › from 2021.07
RM35X0E _55 Steering _078944 POWER ASSIST SYSTEMS _0388797 VANE PUMP(for 1GD-FTV(w/ Variable Flow Control Solenoid Valve)) A

POWER ASSIST SYSTEMS  VANE PUMP(for 1GD-FTV(w/ Variable Flow Control Solenoid Valve))  INSTALLATION  


PROCEDURE

Hide 44310 1.INSTALL VANE PUMP ASSEMBLY

a.

Install the vane pump assembly with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 44410 2.CONNECT PRESSURE FEED TUBE ASSEMBLY

a.

Install a new gasket to the pressure feed tube assembly.


b.
C412772C01
0.615,1.625 0.698,1.302 true 0.5,1.656 0.708,1.906 0.208,0.25 10 true *a
*a Stopper


Install the union bolt and connect the pressure feed tube assembly to the vane pump assembly.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)

HINT:

Make sure that the stopper of the pressure feed tube assembly touches the front housing.



c.

Connect the connector.


Hide 44348D 3.CONNECT NO. 2 OIL RESERVOIR TO PUMP HOSE

a.

Connect the No. 2 oil reservoir to pump hose to the vane pump assembly and slide the hose clip.


Hide 16361A 4.INSTALL FAN AND GENERATOR V BELT

Hide 12601B 5.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/ Cover)

Hide 6.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 7. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART


Hide 8.ADD POWER STEERING FLUID

Hide 10.INSPECT FOR POWER STEERING FLUID LEAK