2007-2013 Highlander Kluger · Service Manual BODY

INSTALLATION

Removal / installation · Vehicles built Aug 2008 – Jun 2010

Versions by build date: May 2007 – Jul 2008 Aug 2008 – Jun 2010 from Jul 2010


1. INSTALL HOOD LOCK CONTROL CABLE ASSEMBLY

  1. Pass the hood lock control cable assembly into the engine compartment.

    B174195E01

    Area
    Part Name
    Area
    Part Name
    A
    Hood lock control cable
    E
    Fender liner
    B
    Clamp
    F
    Hood stopper rubber
    C
    Hood cable grommet
    G
    Front washer hose
    D
    Wire harness
    H
    Rear washer hose

  1. Pass the cable through the upper radiator support.

  1. Connect the clamps as shown in the illustration.

  1. B174196
    Connect the hood lock control cable to the hood lock control lever.


2. INSTALL HOOD LOCK ASSEMBLY (w/o Engine Hood Courtesy Switch)

  1. B174197
    Apply MP grease to the sliding areas of the lock.

  1. B174190
    Connect the hood lock control cable.

  1. B174189
    Install the hood lock assembly with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. B174188
    Install the hood lock nut cap.


3. INSTALL HOOD LOCK ASSEMBLY (w/ Engine Hood Courtesy Switch)

  1. B174198
    Apply MP grease to the sliding areas of the lock.

  1. B174194
    Connect the hood lock control cable.

  1. B174193
    Install the hood lock assembly with the 3 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. B174192
    Install the hood lock nut cap.

  1. B174191
    Connect the connector.


4. INSPECT HOOD SUB-ASSEMBLY

  1. Check that the clearance measurements of areas A through D are within each standard range.

    B172916E01

    Standard clearance:
    Area
    Measurement
    Area
    Measurement
    A
    6.2 to 10.2 mm (0.244 to 0.402 in.)
    C
    2.5 to 5.5 mm (0.098 to 0.217 in.)
    B
    5.9 to 9.9 mm (0.232 to 0.390 in.)
    D
    -1.5 to 1.5 mm (-0.059 to 0.059 in.)


5. ADJUST HOOD SUB-ASSEMBLY

  1. Horizontally and vertically adjust the hood.

    1. B172912
      Loosen the 4 hinge bolts of the hood.

    2. Adjust the clearance between the hood and front fender by moving the hood.

    3. Tighten the 4 hinge bolts after the adjustment.

      Torque:
      13 N*m{ 133 kgf*cm , 10 ft.*lbf }

  1. Adjust the height of the front end of the hood using the cushion rubber.

    1. B172913
      Adjust the cushion rubbers so that the heights of the hood and fender are aligned.

      HINT:
      Raise or lower the front end of the hood by turning the cushion rubber.

  1. Adjust the hood lock.

    1. B174192
      Remove the hood lock nut cap.

    2. B172915
      Loosen the 3 bolts.

    3. Tighten the bolts after the adjustment.

      Torque:
      8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

    4. B174192
      Install the hood lock nut cap.

    5. Check that the striker can engage with the hood lock smoothly.


6. INSTALL RADIATOR GRILLE

  1. B172748
    Engage the 4 guides and 6 claws, and install the radiator grille.

  1. B172746
    Install the 4 clips and 2 bolts.


7. INSTALL COOL AIR INTAKE DUCT SEAL

  1. B172745
    Install the cool air intake duct seal with the 11 clips.


8. INSTALL FRONT FENDER LINER LH

  1. B174751
    Install the front fender liner LH with the 5 clips and 8 screws.

  1. B174749
    Install 2 new grommets.

  1. Using a 4 mm hexagon wrench, install the 2 screws.

  1. B175997
    Install the screw and pin hold clip.

    Torque:
    3.0 N*m{ 31 kgf*cm , 27 in.*lbf }


9. INSTALL FRONT FENDER MOULDING SUB-ASSEMBLY LH
  1. Clean the vehicle body surface.

    1. Using a heat light, heat the vehicle body surface.

    2. Remove the front fender side protector from the vehicle body.

    3. Wipe off any tape adhesive residue with cleaner.

  1. B172797E01
    Clean the front fender moulding sub-assembly. (If reusing the front fender moulding sub-assembly)

    1. Using a heat light, heat the front fender moulding sub-assembly.

    2. Remove the front fender side protector from the front fender moulding sub-assembly.

    3. Wipe off any tape adhesive residue with cleaner.

    4. Install a new front fender side protector to the the front fender moulding sub-assembly.

  1. Install 2 new No. 4 clips on the front fender moulding sub-assembly.

  1. Install a new pad on the front fender moulding sub-assembly.

  1. B172796
    Install the front fender moulding sub-assembly.

    1. Using a heat light, heat the vehicle body and the front fender moulding sub-assembly.

    2. Remove the release paper from the front fender moulding sub-assembly.

      HINT:
      After removing the release paper, keep the exposed adhesive free from foreign matter.

    3. Engage the 3 clips and install the front fender moulding sub-assembly.

  1. B172795
    Using a 4 mm hexagon wrench, install the screw.

  1. Install the clip.


10. INSTALL NO. 1 ENGINE UNDER COVER

  1. A171855
    Install the No. 1 engine under cover with the 6 bolts and 2 clips.


11. INSTALL ENGINE UNDER COVER ASSEMBLY

  1. A171850
    Install the engine under cover assembly with the 2 bolts, 2 screws and 5 clips.

  1. A171849
    Install the engine under cover assembly RR with the 2 bolts.

← INSTALLATION (May 2007 – Jul 2008)INSTALLATION (from Jul 2010) →