Home › Vehicle Exterior › LIGHTING (EXT) › LIGHTING SYSTEM › 2013.12–2016.11
RM3160E _59 Vehicle Exterior _019722 LIGHTING (EXT) _0103403 LIGHTING SYSTEM J

LIGHTING (EXT)  LIGHTING SYSTEM  Daytime Running Light Relay Circuit  


DESCRIPTION

The main body ECU (multiplex network body ECU) controls the daytime running lights via the semiconductor pwr integration ECU.


WIRING DIAGRAM

E287443
2.469,0.396 4.302,0.594 1.833,0.198 10 false from Battery 1.167,1.042 1.625,1.24 0.458,0.198 10 false ALT 1.677,1.302 1.833,1.5 0.156,0.198 10 false 1 1.677,1.729 1.833,1.927 0.156,0.198 10 false 1 1.646,2.177 1.896,2.406 0.25,0.229 10 false 14 1.688,2.604 1.844,2.802 0.156,0.198 10 false 5 1.635,1.521 1.948,1.719 0.313,0.198 10 false 1A 1.656,1.948 1.969,2.146 0.313,0.198 10 false 1B 1.646,2.365 1.958,2.563 0.313,0.198 10 false 1D 1.625,2.802 1.938,3 0.313,0.198 10 false 1G 2.01,1.521 2.469,1.719 0.458,0.198 10 false ALT 2.479,1.521 3.094,1.719 0.615,0.198 10 false DRLS 2,1.938 2.458,2.135 0.458,0.198 10 false BATT 2,2.365 2.458,2.563 0.458,0.198 10 false GND1 2,2.792 2.458,2.99 0.458,0.198 10 false GND2 2.469,2.948 3.083,3.146 0.615,0.198 10 false HRDR 2.5,2.542 3.115,2.74 0.615,0.198 10 false HLDR 1.833,3.271 3.073,3.698 1.24,0.427 10 false Semiconductor Pwr Integration ECU 3.052,1.521 3.365,1.719 0.313,0.198 10 false 1D 3.052,2.563 3.365,2.76 0.313,0.198 10 false 1F 3.052,2.948 3.365,3.146 0.313,0.198 10 false 1F 4.115,1.521 4.427,1.719 0.313,0.198 10 false 4F 4.115,1.323 4.427,1.521 0.313,0.198 10 false 26 5.656,1.427 5.969,1.625 0.313,0.198 10 false 25 5.927,1.521 6.542,1.719 0.615,0.198 10 false DRLE 4.24,1.917 5.865,2.344 1.625,0.427 10 false Instrument Panel Junction Block Assembly 3.094,1.323 3.25,1.521 0.156,0.198 10 false 9 3.104,2.344 3.26,2.542 0.156,0.198 10 false 7 3.094,2.771 3.25,2.969 0.156,0.198 10 false 8 5.427,6.375 5.74,6.573 0.313,0.198 10 false MB 5.427,6.563 7.094,7.031 1.667,0.469 10 false Main Body ECU (Multiplex Network Body ECU) 1.708,4.552 1.865,4.75 0.156,0.198 10 false 1 1.698,6.219 1.854,6.417 0.156,0.198 10 false 1 2.76,4.552 2.917,4.75 0.156,0.198 10 false B 2.76,6.219 2.917,6.417 0.156,0.198 10 false B 1.906,4.552 2.063,4.75 0.156,0.198 10 false E 1.906,6.219 2.063,6.417 0.156,0.198 10 false E 2.948,4.552 3.104,4.75 0.156,0.198 10 false 2 2.958,6.219 3.115,6.417 0.156,0.198 10 false 2 1.406,5.052 1.865,5.25 0.458,0.198 10 false A16 1.396,5.208 3.875,5.438 2.479,0.229 10 false Daytime Running Light Assembly LH 1.417,6.708 1.875,6.906 0.458,0.198 10 false A24 1.417,6.854 3.896,7.083 2.479,0.229 10 false Daytime Running Light Assembly RH


CAUTION / NOTICE / HINT

NOTICE:
·

Inspect the fuses for circuits related to this system before performing the following procedure.

·

If the main body ECU (multiplex network body ECU) is replaced, refer to Service Bulletin.*

*: w/ Smart Entry and Start System


·

As the door control battery is installed between the vehicle battery and main body ECU (multiplex network body ECU), first perform the inspections in On-Vehicle Inspection to confirm that there are no malfunctions in the power source circuit for the main body ECU (multiplex network body ECU) before performing this troubleshooting procedure.*

Click hereVehicle Interior>DOOR LOCK>POWER DOOR LOCK CONTROL SYSTEM>ON-VEHICLE INSPECTION

*: for LHD




PROCEDURE

1.PERFORM ACTIVE TEST USING GTS
a.

Connect the GTS to the DLC3.


b.

Turn the ignition switch to ON.


c.

Turn the GTS on.


d.

Enter the following menus: Body Electrical / Main Body / Active Test.


e.

Check that the daytime running lights illuminate.

Body Electrical > Main Body > Active Test
Tester Display Measurement Item Control Range Diagnostic Note
Daytime Running Light Daytime running lights ON/OFF -
Body Electrical > Main Body > Active Test
Tester Display
Daytime Running Light
50004 123 63
OK:

The daytime running lights illuminate.



Result:
Proceed to
OK
NG



OK

PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE

NG

2.CHECK SEMICONDUCTOR PWR INTEGRATION ECU
2.CHECK SEMICONDUCTOR PWR INTEGRATION ECU
a.

Using a voltmeter, check the signal reading of the semiconductor pwr integration ECU.

Click herePower Source / Network>POWER DISTRIBUTION>INTEGRATION RELAY>ON-VEHICLE INSPECTION

OK:

Output signal reading is normal.



Result:
Proceed to
OK
NG



OK

3.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR PWR INTEGRATION ECU POWER SOURCE AND BODY GROUND)

NG

INSPECT SEMICONDUCTOR PWR INTEGRATION ECU (RESULTS OF SIGNAL READING CHECK)

3.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR PWR INTEGRATION ECU POWER SOURCE AND BODY GROUND)
a.

Remove the semiconductor pwr integration ECU from the No. 1 engine room relay block and No. 1 junction block assembly.

Click herePower Source / Network>POWER DISTRIBUTION>INTEGRATION RELAY>REMOVAL


B352092C07
0.75,3.063 1.083,3.271 0.333,0.208 2.542,3.073 2.875,3.281 0.333,0.208 4.292,3.073 4.625,3.281 0.333,0.208 6.094,3.052 6.427,3.26 0.333,0.208 1.427,4.417 1.083,4.135 false 3.208,4.49 2.906,4.219 false 4.052,4.438 4.26,4.188 false 5.906,4.396 6.115,4.146 false 0.552,0.448 0.865,0.646 0.313,0.198 10 false *a 0.833,3.083 1.146,3.281 0.313,0.198 10 false 1A 4.365,3.104 4.677,3.302 0.313,0.198 10 false 1G 6.188,3.083 6.5,3.281 0.313,0.198 10 false 1B 2.615,3.104 2.927,3.302 0.313,0.198 10 false 1D 1.323,4.427 1.781,4.625 0.458,0.198 10 false ALT 3.063,4.521 3.677,4.719 0.615,0.198 10 false GND1 3.865,4.469 4.479,4.667 0.615,0.198 10 false GND2 5.708,4.417 6.323,4.615 0.615,0.198 10 false BATT
*a Component without semiconductor pwr integration ECU connected
(No. 1 Engine Room Relay Block and No. 1 Junction Block Assembly)
- -


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
1B-1 (BATT) - Body ground Always 11 to 14 V
1A-1 (ALT) - Body ground Always 11 to 14 V



c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1D-14 (GND1) - Body ground Always Below 1 Ω
1G-5 (GND2) - Body ground Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

4.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR PWR INTEGRATION ECU - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

4.CHECK HARNESS AND CONNECTOR (SEMICONDUCTOR PWR INTEGRATION ECU - INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY)
a.

Disconnect the 4F instrument panel junction block assembly connector.


b.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1D-9 (DRLS) - 4F-26 Always Below 1 Ω
4F-26 - Body ground Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

5.INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR

5.INSPECT INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY
a.

Remove the instrument panel junction block assembly.

Click herePower Source / Network>POWER DISTRIBUTION>MAIN BODY ECU>REMOVAL


b.

Remove the main body ECU (multiplex network body ECU) from the instrument panel junction block assembly.


c.

Measure the resistance according to the value(s) in the table below.

E259752C16
1.229,0.302 1.563,0.531 0.333,0.229 4.594,0.458 4.927,0.688 0.333,0.229 5.531,1.5 5.76,1.115 false 0.125,0.083 0.438,0.281 0.313,0.198 10 false *a 1.323,0.344 1.635,0.542 0.313,0.198 10 false 4F 4.677,0.5 4.99,0.698 0.313,0.198 10 false MB 5.344,1.531 5.958,1.729 0.615,0.198 10 false DRLE
*a Component without harness connected
(Instrument Panel Junction Block Assembly)
- -


Standard Resistance:
Tester Connection Condition Specified Condition
4F-26 - MB-25 (DRLE) Always Below 1 Ω



Result:
Proceed to
OK
NG



OK

6.CHECK SEMICONDUCTOR PWR INTEGRATION ECU

NG

REPLACE INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY

6.CHECK SEMICONDUCTOR PWR INTEGRATION ECU
a.

Replace the semiconductor pwr integration ECU with a new or known good one.

Click herePower Source / Network>POWER DISTRIBUTION>INTEGRATION RELAY>REMOVAL


b.

Check that the daytime running lights operate normally.

OK:

The daytime running lights operate normally.



Result:
Proceed to
OK
NG



OK

END (SEMICONDUCTOR PWR INTEGRATION ECU WAS DEFECTIVE)

NG

REPLACE MAIN BODY ECU (MULTIPLEX NETWORK BODY ECU)