Home › Power Source / Network › 2GR-FE BATTERY / CHARGING › GENERATOR › 2013.12–2016.11
RM3160E _57 Power Source / Network _019670 2GR-FE BATTERY / CHARGING _0105679 GENERATOR A

2GR-FE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the wire harness clamp bracket with the bolt.

Torque:
8.4 N*m (86 kgf*cm, 74 in.*lbf)


b.

Connect the generator assembly bracket with the wire harness clamp.


c.

Install generator assembly with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


d.

Temporarily install the generator assembly bracket with the 2 bolts.


e.

Fully tighten the generator assembly bracket with the 2 bolts.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


f.

Connect the 3 wire harness clamps.


g.

Connect the compressor and magnetic clutch connector to the compressor and magnetic clutch.


h.

Connect the generator assembly connector to the generator assembly.


i.

Connect the wire harness to terminal B and install the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


j.

Install the terminal cap.


Hide 12142 3.INSTALL NO. 2 ENGINE OIL LEVEL DIPSTICK GUIDE

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION