When the ignition switch is turned to ON, the battery voltage is applied to the IGSW terminal of the ECM.
The output signal from the MREL terminal of the ECM causes a current to flow to the coil of the semiconductor pwr integration ECU (EFI MAIN relay), closing the contacts and supplying power to terminals +B and +B2 of the ECM.
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Disconnect the semiconductor pwr integration ECU connector.
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1E-1 - Body ground | Ignition switch ON | 11 to 14 V |
| Result | Proceed to |
|---|---|
| OK | A |
| NG (w/o Smart Entry and Start System) | B |
| NG (w/ Smart Entry and Start System) | C |
A
B
C
| *1 | No. 1 Engine Room Relay Bock and No. 1 Junction Block Assembly |
Disconnect the semiconductor pwr integration ECU connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| B-1 - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the semiconductor pwr integration ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1D-14 - Body ground | Always | Below 1 Ω |
| 1G-5 - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the semiconductor pwr integration ECU (EFI MAIN relay, IG2 relay).
Click herePower Source / Network>POWER DISTRIBUTION>INTEGRATION RELAY>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the semiconductor pwr integration ECU connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1G-4 - A43-4 (IGSW) | Always | Below 1 Ω |
| 1G-6 - A43-46 (MREL) | Always | Below 1 Ω |
| 1G-1 - A43-2 (+B) | Always | Below 1 Ω |
| 1G-2 - A43-3 (+B2) | Always | Below 1 Ω |
| 1G-4 or A43-4 (IGSW) - Body ground and other terminals | Always | 10 kΩ or higher |
| 1G-6 or A43-46 (MREL) - Body ground and other terminals | Always | 10 kΩ or higher |
| 1G-1 or A43-2 (+B) - Body ground and other terminals | Always | 10 kΩ or higher |
| 1G-2 or A43-3 (+B2) - Body ground and other terminals | Always | 10 kΩ or higher |
If a short is detected in any of the above circuits, there may be a malfunction in the circuit of a connected ECU.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C1-53 (E1) - Body ground | Always | Below 1 Ω |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the ignition switch assembly connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| F50-4 (AM2) - Body ground | Always | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the ignition switch assembly.
Click hereEngine / Hybrid System>2GR-FKS STARTING>IGNITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the certification ECU (smart key ECU assembly) connector.
Disconnect the semiconductor pwr integration ECU connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| F10-3 (IG1D) - 1E-1 | Always | Below 1 Ω |
| F10-3 (IG1D) or 1E-1 - Body ground and other terminals | Always | 10 kΩ or higher |
If a short is detected in any of the above circuits, there may be a malfunction in the circuit of a connected ECU.
| Proceed to |
|---|
| OK |
| NG |
OK
NG