Home › Engine / Hybrid System › 2GR-FKS (ENGINE CONTROL) › ECM
RM37A0E _51 Engine / Hybrid System _086849 2GR-FKS ENGINE CONTROL _0418440 ECM A

2GR-FKS ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 89668 1.INSTALL NO. 2 ECM BRACKET

a.

Install the No. 2 ECM bracket to the ECM with the 2 screws.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


Hide 89667E 2.INSTALL NO. 1 ECM BRACKET

a.

Install the No. 1 ECM bracket to the ECM with the 2 screws.

Torque:
4.5 N*m (46 kgf*cm, 40 in.*lbf)


Hide 89661 3.INSTALL ECM

a.

Install the ECM with the 2 bolts and nut.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)

NOTICE:

If the ECM has been struck or dropped, replace it.



b.
A454778

Connect the 2 ECM connectors and rotate the 2 levers to lock them.

NOTICE:
·

When connecting the ECM connectors, make sure that the connecting parts of the ECM connectors are free of dirt, water and other foreign matter.

·

Be sure to securely connect the ECM connectors.




Hide 4.INSTALL AIR CLEANER ASSEMBLY WITH AIR CLEANER HOSE

Hide 17750A 5.INSTALL INLET AIR CLEANER ASSEMBLY

Hide 53295E 6.INSTALL COOL AIR INTAKE DUCT SEAL

Hide 7.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL