Home › Power Source / Network › 2GR-FKS (BATTERY / CHARGING) › GENERATOR
RM37A0E _57 Power Source / Network _086881 2GR-FKS BATTERY / CHARGING _0419980 GENERATOR A

2GR-FKS BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 27020 1.INSTALL GENERATOR ASSEMBLY

a.

Install the No. 1 generator bracket to the generator assembly with the bolt.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)


b.

Install the wire harness clamp bracket with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


c.

Install the generator assembly with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


d.

Type A:

i.

Install the bolt.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)



e.

Type B:

i.

Install the nut.

Torque:
20 N*m (204 kgf*cm, 15 ft.*lbf)



f.

Engage the wire harness clamp.


g.

Connect the compressor assembly with magnetic clutch connector.


h.

Connect the generator assembly connector.


i.

Connect the wire harness to terminal B with the nut.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


j.

Close the terminal cap.


Hide 16361A 2.INSTALL V-RIBBED BELT

Hide 16400 3.INSTALL RADIATOR ASSEMBLY

Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL