Home › ENGINE ยท 2KD-FTV › LUBRICATION › OIL PUMP (w/ EGR Cooler)

OIL PUMP (w/ EGR Cooler) > INSTALLATION

for Preparation Click here


NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.



1. INSTALL TIMING GEAR CASE ASSEMBLY


A060152E02
  1. Install 2 new O-rings to the cylinder block.

  1. Remove any old seal packing (FIPG) material from the timing gear case and cylinder block.



    A060151E03
  1. Set a new oil pump gasket to the timing gear case.



    A075511E06
  1. Apply seal packing to the areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Block, Three Bond 1207B or equivalent

    Seal diameter:
    4.0 mm (0.157 in.)

    NOTICE:
    1. After applying FIPG, install the timing gear case within 3 minutes and tighten the bolts within 15 minutes.
    2. Do not start the engine for at least 2 hours after the installation.



    A060280E02
  1. Install the timing gear case with the 8 bolts and union bolt labeled A shown in the illustration.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt
    16 N*m{ 163 kgf*cm , 12 ft.*lbf } for union bolt

  1. Make sure that the oil pump drive gear rotates smoothly.
    If the gear does not rotate smoothly, remove the 8 bolts and union bolt to release the gear. Then install the bolts and gear again.

  1. Install the No. 1 vacuum transmitting pipe with the nut.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



2. INSTALL OIL PAN SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the 2 bolts and nut.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Remove old seal packing (FIPG) from the oil pan and cylinder block.



    A151187E01
  1. Apply seal packing to the areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Block, Three Bond 1207B or equivalent

    Seal diameter:
    4.0 mm (0.157 in.)

    NOTICE:
    1. After applying FIPG, install the oil pan within 3 minutes and tighten the bolts within 15 minutes.
    2. Do not start the engine for at least 2 hours after the installation.

  1. Install the oil pan with the 22 bolts and 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }



3. INSTALL OIL DIPSTICK GUIDE


    A148132
  1. Install a new O-ring to the guide.

  1. Apply a small amount of clean engine oil to the O-ring.

  1. Install the guide with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Install the injection pipe clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }



4. INSTALL FUEL SUPPLY PUMP ASSEMBLY


A070715E01
  1. Check that the supply pump gear in the timing gear case moves back and forth smoothly.

  1. Install a new O-ring to the pump.

  1. Apply a light coat of engine oil to the O-ring.



    A060835E01
  1. Align the set key on the drive shaft with the groove of the injection gear.



    A153560
  1. Install the pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Set a new O-ring.



    A070711E01
  1. Using SST, hold the crankshaft pulley and install the set nut.

    SST
    09213-58013  
    09330-00021  

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }



    A071144E01
  1. Using a dial indicator, measure the thrust clearance of the injection pump shaft by moving the pump drive shaft pulley back and forth.

    Thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    If the clearance is not within the specified range, disassemble and reassemble the supply pump and pump drive shaft pulley. Then repeat step above.



    A153559
  1. Connect the 2 connectors.



    A153558
  1. Connect the 2 fuel hoses.



5. INSTALL INJECTION GEAR
  1. Set a new O-ring and then temporarily install the nut. Using your hand, check the thrust clearance of the supply pump drive shaft by driving the injection gear.

    Thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    HINT:
    If the clearance is not within the specified range, remove the injection gear again and reinstall it.

    NOTICE:
    Fit the key (protrusion) of the supply pump to the key slot of the injection gear.



6. INSTALL CRANKSHAFT TIMING GEAR


A103271
  1. Face the crankshaft timing gear with timing mark 1 facing the forward.

  1. Align the set key on the crankshaft with the key groove of the crankshaft timing gear.

  1. Using SST and a hammer, tap in the timing gear.

    SST
    09223-00010  



7. INSTALL NO. 1 IDLE GEAR


A060159E03
  1. Install the gear shaft as shown in the illustration.



    A038763E01
  1. Apply light coat engine oil to the No. 1 idler gear shaft shown in the illustration.



    G036757E01
  1. Align the "5" timing marks of the idle gear and crankshaft timing gear.

  1. Using SST, turn the supply pump gear, and align the "4" timing marks of the idle gear and injection gear, and mesh the gears.

    SST
    09960-10010   (09962-01000, 09963-00700)



    A060161E03
  1. Temporarily install the No. 1 idle gear with the idle gear thrust plate and 2 bolts.

    HINT:
    Face the thrust plate with the protrusion outward.

  1. Secure the idle gears to the idle gear the service bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Tighten the No. 1 idle gear with the 2 bolts.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

  1. Remove the service bolt.



    A103273
  1. Install the No. 1 crankshaft angle sensor plate.



8. INSTALL TIMING GEAR COVER


A072411E01
  1. Install a new O-ring to the timing gear case.

  1. Remove any old seal packing (FIPG) material from the timing gear cover.



    A075513E03
  1. Apply seal packing to the areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Block, Three Bond 1207B or equivalent

    Seal diameter:
    4.0 mm (0.157 in.)

    NOTICE:
    1. After applying FIPG, install the gear cover within 3 minutes and tighten the bolts and nuts within 15 minutes.
    2. Do not start the engine for at least 2 hours after the installation.



    A060274E01
  1. Install the cover with the 14 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



9. INSTALL CRANKSHAFT POSITION SENSOR
  1. Apply clean engine oil to a new O-ring.

  1. Install the sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }



10. INSTALL CAMSHAFT POSITION SENSOR
  1. Apply clean engine oil to a new O-ring.

  1. Install the sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }



11. INSTALL CRANKSHAFT PULLEY


A072417E02
  1. Align the pulley set key with the key groove of the pulley.

  1. Using SST, install the pulley bolt.

    SST
    09213-58014  
    09330-00021  

    Torque:
    365 N*m{ 3722 kgf*cm , 270 ft.*lbf }



12. INSTALL PUMP DRIVE SHAFT PULLEY
  1. Install a new O-ring to the supply pump.

  1. Temporarily install the supply pump with the nut.



    A070711E01
  1. Using SST, hold the crankshaft pulley and tighten the nut.

    SST
    09213-58013  
    09330-00021  

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }



    A038747E01
  1. Install the camshaft timing pulley flange No. 2 and pump drive shaft pulley with the 4 bolts.

    Torque:
    31 N*m{ 316 kgf*cm , 23 ft.*lbf }



    A036609E01
  1. Move the pump drive shaft pulley back and forth to check the thrust clearance of the pump drive shaft.

    Thrust clearance:
    0.15 to 0.55 mm (0.0059 to 0.0217 in.)

    If the clearance is not within the specified range, disassemble and reassemble the supply pump and pump drive shaft pulley. Then repeat step above.



13. INSTALL VANE PUMP ASSEMBLY


A098935E01
  1. Install a new O-ring to the vane pump.

  1. Install the vane pump with the 2 nuts.

    Torque:
    41 N*m{ 418 kgf*cm , 30 ft.*lbf }



14. INSTALL VACUUM PUMP ASSEMBLY


A098930E01
  1. Install 2 new O-rings to the vacuum pump.

  1. Install the vacuum pump with the 2 nuts.

    Torque:
    21 N*m{ 210 kgf*cm , 15 ft.*lbf }



15. INSTALL TIMING GEAR COVER INSULATOR


    A148171
  1. Install the gear cover insulator with the bolt.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



16. INSTALL WATER PUMP ASSEMBLY


    A225339
  1. Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



17. INSTALL CYLINDER BLOCK INSULATOR


    A149941
  1. Install the block insulator to the head.



18. INSTALL NO. 2 TIMING BELT COVER


A060279E01
  1. Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    After applying FIPG, install the No. 2 timing belt cover within 3 minutes and tighten its bolts and nut within 15 minutes.

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



19. INSTALL CAMSHAFT TIMING PULLEY


A060182E01
  1. Install the camshaft timing pulley.

  1. Fasten the bolt of the camshaft timing pulley by holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1000 kgf*cm , 72 ft.*lbf }



20. INSTALL TIMING BELT


    A070691E02
  1. Check that the timing marks are aligned as shown in the illustration.

    HINT:
    If reusing the timing belt, align the points marked during removal, and install the belt with the arrow pointing in the direction of engine revolution.

    NOTICE:
    1. The engine should be cold.
    2. When turning the crankshaft, the valve heads will hit against the piston's top position. Do not turn it more than necessary.

  1. Using a 10 mm hexagon wrench, install the timing belt idler pulley and new washer with the bolt.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

  1. Check that the idler pulley moves smoothly.
    If it does not move smoothly, check the idler sub-assembly and washer.

  1. Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.



    A070548E01
  1. Place the tensioner upright. Then set the press to the top of the tensioner.

    NOTICE:
    1. Do not scratch or deform the rod end.
    2. Press in the tensioner rod upward.
    3. Protect the tip of the push rod with a cloth in order to prevent damage.

  1. Using a press, slowly push in the push rod using 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force.

    NOTICE:
    Do not impose a load of over 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) to the push rod.

  1. Align the holes of the push rod and housing. Then pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.

  1. Install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.

  1. Tighten the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    NOTICE:
    Uniformly tighten the 2 bolts and install the tensioner.



    A059983E01
  1. Remove the 1.5 mm hexagon wrench from the tensioner.



    A070549E02
  1. Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.



21. INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY


22. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


A060179E02
  1. Remove any old seal packing (FIPG) material from the cylinder head.

  1. Apply seal packing to the specific areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the belt cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the seal packing.



    G034877E01
  1. Install the gasket and cylinder head cover with the 10 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }



23. INSTALL VENTILATION PIPE


    A151251
  1. Connect the ventilation pipe to the cylinder head cover, and then install the bolt to the pipe.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



24. INSTALL NO. 4 INJECTION PIPE

NOTICE:
  1. When replacing an injector, it is necessary to replace the 4 injection pipes with new ones.
  2. Keep the joints of the injection pipe clean.



    A152275
  1. Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    1. If an injection pipe clamp is removed from the No. 4 injection pipe, replace the injection clamp with a new one.
    2. Make sure that the inner-rubbers of the injection pipe fit inside the clamp.
    3. When installing the pipe, check that the inner rubbers and the clamp are in their proper positions.



    A152280E02
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Using a union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).



25. INSTALL EGR COOLER WITH ELECTRIC EGR CONTROL VALVE AND NO. 2 EGR VALVE
  1. install the EGR cooler with electric EGR control valve and No. 2 EGR valve (Click here).



26. INSTALL FUEL INLET PIPE SUB-ASSEMBLY


    A154319E01
  1. Temporarily install the fuel inlet pipe with the union nuts.

    NOTICE:
    1. If the supply pump is replaced, the fuel inlet pipe must be replaced.
    2. Keep the fuel inlet pipe free of foreign matter.

  1. ) Install a new O-ring to the oil level gauge guide, and install the oil level gauge guide to the cylinder block.

    NOTICE:
    Apply a coat of engine oil to the O-ring.



    A153562
  1. Temporarily install the stay of the oil level gauge guide to the intake manifold with the bolt.



    A153410E01
  1. Install the clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    Install the clamp so that the fuel inlet pipe marking can be seen on both sides of the clamp.

  1. Tighten the bolt of the oil level gauge guide stay.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



    A152337E03
  1. Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.

    Torque:
    without union nut wrench:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    with union nut wrench:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.81 in.). If using a torque wrench with a length that is not 30 cm, calculate the torque specification for the torque wrench and union nut wrench based on the "without union nut wrench" torque specification (Click here).
    2. Make sure union nut wrench and wrench are connected in a straight line.

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nut on the supply pump side.

    Torque:
    without union nut wrench:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    with union nut wrench:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.81 in.). If using a torque wrench with a length that is not 30 cm, calculate the torque specification for the torque wrench and union nut wrench based on the "without union nut wrench" torque specification (Click here).
    2. Make sure union nut wrench and wrench are connected in a straight line.



27. INSTALL ENGINE ASSEMBLY
  1. Install the engine (Click here).



28. ADD ENGINE OIL
  1. Wipe the oil pan and drain plug.

  1. Install a new gasket and the drain plug.

    Torque:
    34 N*m{ 347 kgf*cm , 25 ft.*lbf }

  1. Add new oil.

    Standard oil capacity:

    Item
    Specified Condition
    Drain and refill with oil filter change
    6.9 liters (7.3 US qts, 6.1 Imp. qts)
    Drain and refill without oil filter change
    6.6 liters (7.0 US qts, 5.8 Imp. qts)
    Dry fill
    7.4 liters (7.8 US qts, 6.5 Imp. qts)

  1. Install the oil filler cap.



29. BLEED AIR FROM FUEL SYSTEM


    A098962E02
  1. Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. Hand pump pumping speed: Max. 2 strokes/ sec.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use, and the engine cannot be started.

  1. Start the engine.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1



    A194065E03
  1. Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3



  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.


    A192848E05

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.



30. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).



31. PERFORM REGISTRATION
  1. Perform registration of the injector compensation codes .

  1. Perform pilot quantity learning .



32. PERFORM INITIALIZATION
  1. Perform initialization of the crank time compensation reset function (Click here).



33. INSPECT ENGINE OIL LEVEL


34. INSPECT FOR FUEL LEAK


C108852E01

CAUTION:
  1. During Active Test mode, engine speed becomes high and combustion noise becomes loud, so pay attention.
  2. During Active Test mode, fuel becomes high-pressured. Be extremely careful not to expose your eyes, hands, or body to escaped fuel.

  1. Check that there are no leaks from any part of the fuel system when the engine is stopped.
    If there is fuel leakage, repair or replace parts as necessary.

  1. Start the engine and check that there are no leaks from any part of the fuel system.
    If there is fuel leakage, repair or replace parts as necessary.

  1. Disconnect the return hose from the common rail.

  1. Start the engine and check for fuel leaks from the return pipe.
    If there is fuel leakage, replace the common rail.

  1. Connect the intelligent tester to the DLC3.

  1. Start the engine and push the intelligent tester main switch ON.

  1. Select the Fuel Leak test from the Active Test mode on the intelligent tester.

  1. If the intelligent tester is not available, fully depress the accelerator pedal quickly. Increase the engine speed to the maximum and maintain that speed for 2 seconds. Repeat this operation several times.

  1. Check that there are no leaks from any part of the fuel system.

    NOTICE:
    A return pipe leakage of less than 10 cc (0.6 cu in.) per minute is acceptable.

    If there is fuel leakage, repair or replace parts as necessary.

  1. Reconnect the return hose to the common rail.



35. INSPECT FOR ENGINE OIL LEAK


36. INSPECT FOR COOLANT LEAK

NOTICE:
Do not remove the radiator reservoir cap while the engine and radiator are still hot. Pressurized, hot engine coolant and steam may be released and cause serious burns.



    A097645E01
  1. Fill the radiator with coolant and attach a radiator cap tester to the radiator reservoir.

  1. Warm up the engine.

  1. Using the radiator cap tester, increase the pressure inside the radiator to 118 kPa (1.2 kgf/cm2 ,17.1 psi), and check that the pressure does not drop.
    If the pressure drops, check the hoses, radiator and water pump for leaks.
    If no external leaks are found, check the cylinder block and head.