ENGINE ASSEMBLY > INSTALLATION |
| 1. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET LH |
![]() |
Install the mounting bracket with the 4 bolts.
| 2. INSTALL NO. 1 FRONT ENGINE MOUNTING BRACKET RH |
Install the mounting bracket with the 4 bolts.
![]() |
Install the No. 2 cylinder block insulator with the bolt.
| 3. INSTALL ENGINE COOLANT TEMPERATURE SENSOR |
Using a 17 mm deep socket wrench, install the sensor.
| 4. INSTALL CAMSHAFT POSITION SENSOR |
Apply clean engine oil to a new O-ring.
Install the sensor with the bolt.
| 5. INSTALL CRANKSHAFT POSITION SENSOR |
Apply clean engine oil to a new O-ring.
Install the sensor with the bolt.
| 6. INSTALL VANE PUMP ASSEMBLY |
![]() |
Install a new O-ring to the vane pump.
Install the vane pump with the 2 nuts.
| 7. INSTALL VACUUM PUMP ASSEMBLY |
![]() |
Install 2 new O-rings to the vacuum pump.
Install the vacuum pump with the 2 nuts.
| 8. INSTALL TIMING GEAR COVER INSULATOR (w/ EGR Cooler) |
![]() |
Install the gear cover insulator with the bolt.
| 9. INSTALL OIL COOLER COVER SUB-ASSEMBLY |
![]() |
Install a new gasket and the oil cooler cover with the 13 bolts and 2 nuts.
Connect the oil pressure connector and install the wire harness.
| 10. INSTALL COMMON RAIL ASSEMBLY |
![]() |
Install the common rail with the 2 bolts.
Connect the fuel pressure sensor connector.
| 11. INSTALL FUEL SUPPLY PUMP ASSEMBLY |
![]() |
Check that the supply pump gear in the timing gear case moves back and forth smoothly.
Install a new O-ring to the pump.
Apply a light coat of engine oil to the O-ring.
![]() |
Align the set key on the drive shaft with the groove of the injection gear.
![]() |
Install the pump with the 2 nuts.
Set a new O-ring before tightening the set nut.
![]() |
Using SST, hold the crankshaft pulley and install the set nut.
![]() |
Move the pump drive shaft pulley back and forth to check the thrust clearance of the injection pump drive shaft.
![]() |
Connect the 2 connectors.
![]() |
Connect the 2 fuel hoses.
![]() |
Temporarily install the fuel inlet pipe with the union nuts.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nut on the supply pump side.
Install the oil level gauge guide with the 2 bolts.
![]() |
Install the clamp with the bolt.
| 12. INSTALL INTAKE MANIFOLD (w/ EGR Cooler) |
Install the intake manifold (Click here).
| 13. INSTALL INTAKE MANIFOLD (w/o EGR Cooler) |
![]() |
Install a new gasket and the manifold to the cylinder head with the 4 bolts and 2 nuts in the order shown in the illustration.
| 14. INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY (w/o EGR Cooler) |
![]() |
Temporarily install the leakage pipe with the 3 bolts.
Temporarily install a new gasket with the check valve.
Fully tighten the 3 bolts and check valve.
Connect the 2 fuel hoses.
| 15. INSTALL INJECTION PIPE (w/o EGR Cooler) |
![]() |
Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.
Install the No. 2 and No. 3 injection pipe clamps with the bolt and 2 nuts, as shown in the illustration.
![]() |
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
![]() |
Temporarily install the No. 4 injection pipe with the union nuts.
Install 2 new injection pipe clamps with the 2 bolts.
![]() |
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.
Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.
| 16. INSTALL OIL FILTER SUB-ASSEMBLY |
Check and clean the oil filter installation surface.
Apply clean engine oil to the gasket of a new oil filter.
Lightly screw the oil filter into place by hand. Tighten it until the gasket contacts the seat.
![]() |
Using SST, tighten the oil filter. Depending on the work space available, choose from the following.
If enough space is available, use a torque wrench to tighten the oil filter.
If enough space is not available to use a torque wrench, tighten the oil filter 3/4 turn by hand or with a common wrench.
| 17. INSTALL MANIFOLD STAY (w/o EGR Cooler) |
![]() |
Install the stay with the 2 bolts.
| 18. INSTALL GLOW PLUG ASSEMBLY |
w/ EGR Cooler:
Install the glow plug (Click here).
w/ EGR System:
Install the glow plug (Click here).
w/o EGR System:
Install the glow plug (Click here).
| 19. INSTALL WATER OUTLET |
![]() |
Install a new gasket to the cylinder head, as shown in the illustration.
![]() |
Install the water outlet with the 2 bolts.
| 20. INSTALL THERMOSTAT |
![]() |
Install a new gasket to the thermostat.
Insert the thermostat into the cylinder block with the jiggle valve facing straight upward.
| 21. INSTALL WATER INLET |
![]() |
Install the water inlet with the 3 bolts.
| 22. INSTALL NO. 1 VISCOUS HEATER BRACKET SUB-ASSEMBLY (for Cold Area Specification Vehicles) |
Install the bracket with the 2 bolts.
| 23. INSTALL VISCOUS HEATER WITH MAGNET CLUTCH ASSEMBLY (for Cold Area Specification Vehicles) |
![]() |
Install the viscous with magnet clutch heater with the 2 bolt.
Connect the connect.
| 24. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET (w/ Air Conditioning System) |
Install the bracket with the 4 bolts.
| 25. INSTALL NO. 2 INTERCOOLER SUPPORT BRACKET (w/ EGR Cooler) |
Install the bracket with the 2 bolts.
| 26. INSTALL INTERCOOLER SUPPORT BRACKET (w/ EGR Cooler) |
Install the bracket with the 2 bolts.
| 27. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY |
![]() |
Install the tensioner with the 4 bolts.
| 28. INSTALL GENERATOR BRACKET |
Install the bracket with the bolt.
| 29. INSTALL GENERATOR ASSEMBLY |
![]() |
Install the generator with the 2 bolts.
Install the generator wire with the nut.
Connect the generator connector.
| 30. INSTALL EXHAUST MANIFOLD |
![]() |
w/ EGR Cooler:
Install a new gasket, manifold, 8 new collars and 8 spacers to the cylinder head with 8 new nuts.
w/o EGR Cooler:
Install a new gasket, manifold and 8 spacers to the cylinder head with 8 new nuts.
| 31. INSTALL TURBOCHARGER SUB-ASSEMBLY (w/ EGR Cooler) |
Install the turbocharger (Click here).
| 32. INSTALL TURBOCHARGER SUB-ASSEMBLY (w/o EGR Cooler) |
Install the turbocharger (Click here).
| 33. INSTALL TURBINE OUTLET ELBOW (w/o EGR Cooler) |
![]() |
Temporarily install a new gasket and the outlet elbow (with turbocharger stay) to the turbocharger with the 4 nuts.
Temporarily install the stay with the 2 bolts.
Tighten the 4 nuts of the turbocharger.
Tighten the 2 bolts of the stay.
| 34. INSTALL VENTILATION HOSE HEAT INSULATOR (w/o EGR Cooler) |
Install the insulator with the 2 bolts.
| 35. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY (w/o EGR Cooler) |
![]() |
Connect the pipe (with the 2 air hoses) and install the bolt.
Tighten the 2 clamps of the No. 1 and No. 2 air hoses.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
| 36. INSTALL CRANKSHAFT PULLEY |
![]() |
Align the pulley set key with the key groove of the pulley.
Using SST, install the pulley bolt.
| 37. INSTALL TIMING BELT |
![]() |
Check that the timing marks are aligned as shown in the illustration.
Using a 10 mm hexagon wrench, install the timing belt idler pulley and new washer with the bolt.
Check that the idler pulley moves smoothly.
If it does not move smoothly, check the idler sub-assembly and washer.
Install the timing belt to the pump drive shaft pulley, camshaft timing pulley and No. 1 timing belt idler in sequence.
![]() |
Place the tensioner upright. Then set the press to the top of the tensioner.
Using a press, slowly push in the push rod using 981 to 9,807 N (100 to 1,000 kgf, 220 to 2,205 lbf) of force.
Align the holes of the push rod and housing. Then pass a 1.27 mm hexagon wrench through the holes to keep the setting position of the push rod.
Install the timing belt tensioner with the 2 bolts while pushing the idler pulley toward the timing belt.
Tighten the 2 bolts.
![]() |
Remove the 1.5 mm hexagon wrench from the tensioner.
![]() |
Turn the crankshaft clockwise 720° and check that the timing marks are aligned as shown in the illustration.
| 38. INSTALL NO. 1 TIMING BELT COVER |
Install the timing belt cover with the 6 bolts.
Install the wire harness clamp.
Install the water hose clamp with the bolt.
| 39. INSTALL ENGINE WIRE |
Install the engine wire to the engine.
| 40. REMOVE ENGINE STAND |
Attach the chain block and engine sling device to the engine hangers.
Remove the engine from the engine stand.
| 41. INSTALL ENGINE ASSEMBLY |
![]() |
Slowly lower the engine into the engine compartment.
Install the engine mounting insulator with the 4 bolts and 4 nuts.
Remove the 2 engine hangers.
| 42. INSTALL REAR END PLATE |
Install the end plate with the bolt.
| 43. INSTALL FLYWHEEL SUB-ASSEMBLY |
![]() |
Clean the bolt holes.
Apply adhesive to 2 or 3 threads of a new bolt end.
![]() |
Using SST, hold the crankshaft.
Install the flywheel on the crankshaft.
![]() |
Uniformly install and tighten the 8 bolts in the sequence shown in the illustration.
| 44. INSTALL CLUTCH DISC ASSEMBLY |
![]() |
Insert SST into the clutch disc. Then insert the SST (together with the clutch disc) into the flywheel.
| 45. INSTALL CLUTCH COVER ASSEMBLY |
![]() |
Align the matchmarks on the clutch cover and flywheel.
Tighten the 6 bolts as described below.
Determine the first bolt to be tightened by choosing the bolt closest to the knock pin.
Uniformly tighten the 6 bolts in diametrically opposite pairs relative to the position of the first bolt. Use the illustration as a reference.
Lightly move SST up and down, and right and left.
Check that the disc is in the center, and then tighten the bolts.
| 46. INSTALL COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System) |
Install the compressor with the 4 bolts.
| 47. CONNECT HOSES AND CONNECTORS |
![]() |
Using a union nut wrench, install the pressure feed tube.
![]() |
Connect the 2 fuel hoses.
Connect the vacuum pump hose.
Connect the oil reservoir to pump hose.
![]() |
for LHD:
Connect the connectors.
Connect the 4 ECU connectors.
w/ A.D.D.
Connect the 4WD control ECU connector.
![]() |
for RHD:
Connect the connectors.
Connect the 4 ECU connectors.
w/ A.D.D.
Connect the 4WD control ECU connector.
Connect the injector driver connectors.
![]() |
Install the ground cable with the bolt.
Connect the 2 engine room junction block connectors.
Install the engine room junction block wire with the nut.
Install the engine room relay block cover (side).
Install the engine room relay block cover (upper).
| 48. INSTALL RADIATOR ASSEMBLY |
Install the radiator (Click here).
| 49. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY |
| 50. INSTALL AIR CLEANER ASSEMBLY |
Install the cleaner with the 2 bolts.
w/ Intake Air Temperature Sensor:
Connect the connector to the intake air temperature sensor.
w/ Mass Air Flow Meter:
Connect the connector to the mass air flow meter.
Tighten the hose clamp.
for Ventilation Hose Type:
Connect the ventilation hose.
| 51. INSTALL BATTERY AND BATTERY TRAY |
| 52. INSTALL BATTERY BRACKET |
| 53. INSTALL TRANSMISSION ASSEMBLY |
for R151/R151F:
Install the transmission (Click here).
for G50:
Install the transmission (Click here).
| 54. ADD ENGINE COOLANT |
Tighten the radiator drain cock plug by hand.
Tighten the cylinder block drain cock plug.
![]() |
Fill the radiator with TOYOTA Super Long Life Coolant (SLLC) to the reservoir tank's B line.
Press the inlet and outlet radiator hoses several times by hand, and then check the level of the coolant.
If the coolant level drops below the B line, add TOYOTA SLLC to the B line.
Install the radiator reservoir cap.
![]() |
Using a wrench, install the vent plug.
Bleed air from the cooling system.
Warm up the engine until the thermostat opens. While the thermostat is open, circulate the coolant for several minutes.
Maintain the engine speed at 2,500 to 3,000 rpm.
Press the inlet and outlet radiator hoses several times by hand to bleed air.
Stop the engine and wait until the coolant cools down to ambient temperature.
![]() |
After the coolant cools down, check that the coolant level is at the F line.
If the coolant level is below the F line, add TOYOTA SLLC to the F line.
| 55. ADD FUEL |
| 56. TIGHTEN FUEL TANK CAP ASSEMBLY |
| 57. ADD ENGINE OIL |
Wipe the oil pan and drain plug before installing the plug.
Install a new gasket and the drain plug.
Add new oil.
| Item | Capacity |
| Drain and refill with oil filter change | 6.9 liters (7.3 US qts, 6.1 Imp. qts) |
| Drain and refill without oil filter change | 6.6 liters (7.0 US qts, 5.8 Imp. qts) |
| Dry fill | 7.4 liters (7.8 US qts, 6.5 Imp. qts) |
Install the oil filler cap.
| 58. INSTALL HOOD SUB-ASSEMBLY |
Install the hood with the 4 bolts.
Connect the washer nozzle hose.
Adjust the hood.
| 59. BLEED AIR FROM FUEL SYSTEM |
![]() |
Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.
Start the engine.
When the engine can be started, proceed to the next step.
If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.
Turn the ignition switch off.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON and turn the intelligent tester on.
Clear the DTCs (Click here).
Start the engine.*1
![]() |
Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2
Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3
Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.

Enter the following menus: Powertrain / Engine and ECT / DTC.
Read Current DTCs.
Clear the DTCs (Click here).
Repeat steps *1 to *3.
Enter the following menus: Powertrain / Engine and ECT / DTC.
Read Current DTCs.
| 60. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 61. PERFORM REGISTRATION |
Perform registration of the injector compensation codes .
Perform pilot quantity learning .
| 62. PERFORM INITIALIZATION |
Perform initialization of the crank time compensation reset function (Click here).
| 63. INSPECT FOR OIL LEAK |
| 64. INSPECT FOR COOLANT LEAK |
| 65. INSPECT FOR EXHAUST GAS LEAK |
| 66. INSPECT FOR FUEL LEAK |
| 67. CHECK ENGINE IDLE SPEED AND MAXIMUM SPEED |
![]() |
Connect the intelligent tester to the DLC3.
![]() |
If a tester is not available, connect a tester probe of a tachometer to terminal 9 (TAC) of the DLC3 with SST.
Inspect the idle speed.
Start the engine and measure the idle speed.
Inspect the maximum speed.
Start the engine.
Fully depress the accelerator pedal.
Measure the maximum speed.
If the tester probe of the tachometer is connected to the DLC3, disconnect the tester probe with SST from terminal 9 of the DLC3.
Disconnect the intelligent tester from the DLC3.
| 68. CHECK OIL LEVEL |
| 69. INSTALL NO. 2 ENGINE UNDER COVER (for 4WD) |
Install the under cover with the 2 bolts.
| 70. INSTALL NO. 1 ENGINE UNDER COVER (for 4WD) |
Install the under cover with the 4 bolts.