OIL PUMP > INSTALLATION |
| 1. INSTALL TIMING BELT CASE SUB-ASSEMBLY |
Place a new gasket on the cylinder block.
![]() |
Install the timing belt case with the 5 bolts.
| 2. INSTALL OIL STRAINER SUB-ASSEMBLY |
Install a new gasket and oil strainer with the 2 bolts and 2 nuts.
| 3. INSTALL OIL PAN SUB-ASSEMBLY |
Using a gasket scraper, remove all the old seal packing material from the installation surface of the oil pan and cylinder block.
Remove any old seal packing material and do not drop any oil on the contact surfaces of the oil pan and cylinder block.
Apply seal packing to the oil pan as shown in the illustration.

Install the oil pan with the 16 bolts and 2 nuts. Uniformly tighten the bolts and nuts in several steps.
| 4. INSTALL CRANKSHAFT TIMING PULLEY |
Align the pulley set key with the key groove of the timing pulley.
![]() |
Using SST and a hammer, tap in the timing pulley, facing the flange side inward.
| 5. INSTALL NO. 2 TIMING BELT IDLER SUB-ASSEMBLY |
Install the spacer and No. 2 timing belt idler with the bolt.
Check that the No. 2 timing belt idler moves smoothly.
| 6. INSTALL NO. 1 TIMING BELT IDLER SUB-ASSEMBLY |
![]() |
Temporarily install the No. 1 timing belt idler with the 3 bolts labeled A, B and C.
Tighten the bolt C.
![]() |
| 7. INSTALL WATER PUMP ASSEMBLY |
![]() |
Install a new gasket, the water pump and tension spring bracket with the 6 bolts.
| 8. INSTALL NO. 2 TIMING BELT COVER |
Install the timing belt cover with the 4 bolts.
| 9. INSTALL CAMSHAFT TIMING PULLEY |
Install the woodruff key to the key groove of the camshaft.
Align the pulley set key with the timing mark facing outward.
![]() |
Using SST, install the pulley with the bolt.
| 10. INSTALL INJECTION PUMP ASSEMBLY |
![]() |
Install the injection pump to the timing gear case, and temporarily tighten the 2 nuts.
Install the injection pump stay to the injection pump rear end, and temporarily tighten the 3 bolts.
![]() |
Rotate the pump body to align the markings of the pump flange and timing gear case.
Tighten the 2 nuts to install the injection pump.
Tighten the 3 bolts to install the injection pump stay.
![]() |
Connect the 3 fuel hoses.
Connect the engine speed sensor connector.
Connect the spill control valve connector.
Connect the correction unit connector.
Connect the timing control valve connector.
Connect the fuel temperature sensor connector.
Connect the engine wire clamp.
| 11. INSTALL INJECTION PUMP DRIVE PULLEY |
![]() |
Using SST, install the injection pump drive pulley with the nut.
| 12. INSTALL INJECTION PIPE SUB-ASSEMBLY |
![]() |
Connect the 2 lower pipe clamps onto the intake manifold.
Install the 4 injection pipes.
Secure the injection pipes with the 2 upper pipe clamps and 2 nuts.
| 13. INSTALL TIMING BELT |
Install the timing belt (Click here).
| 14. INSTALL ENGINE ASSEMBLY |
Install the engine assembly (Click here).