Home › ENGINE › 1KD-FTV ENGINE CONTROL SYSTEM › ECD SYSTEM (for DPF)
ECM Power Source Circuit
Circuit diagnosis · Vehicles built from Aug 2014
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 Aug 2013 – Jul 2014 from Aug 2014
DESCRIPTION
When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The MREL output signal from ECM causes a current to flow to the coil, closing the contacts of the MAIN relay and supplying power to terminal +B of the ECM. WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
After replacing the ECM, the new ECM needs registration (Click here ) and initialization (Click here ).
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
1. INSPECT ECM (+B AND +B2 VOLTAGE)
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
Condition
Specified Condition
E31-24 (+B) - E25-1 (E1)
Ignition switch ON
11 to 14 V
E31-17 (+B2) - E25-1 (E1)
Ignition switch ON
11 to 14 V
Text in Illustration
*a
Component with harness connected (ECM)
NG
OK
PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE (Click here )
2. CHECK HARNESS AND CONNECTOR (ECM - BODY GROUND)
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
E25-1 (E1) - Body ground
Always
Below 1 Ω
Reconnect the ECM connector.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
3. INSPECT ECM (IGSW VOLTAGE)
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
E30-24 (IGSW) - E25-1 (E1)
Ignition switch ON
11 to 14 V
Text in Illustration
*a
Component with harness connected (ECM)
NG
OK
4. INSPECT ECM (MREL VOLTAGE)
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
E30-11 (MREL) - E25-1 (E1)
Ignition switch ON
11 to 14 V
Text in Illustration
*a
Component with harness connected (ECM)
NG
OK
5. INSPECT NO. 1 INTEGRATION RELAY (MAIN RELAY)
Inspect the No. 1 integration relay (MAIN relay) (Click here ).
NG
REPLACE NO. 1 INTEGRATION RELAY (MAIN RELAY)
OK
6. CHECK HARNESS AND CONNECTOR (MAIN RELAY - ECM, MAIN RELAY - BODY GROUND)
Check the harness and connector between the No. 1 integration relay (MAIN relay) and ECM.
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
1J-4 - E31-24 (+B)
Always
Below 1 Ω
1J-5 - E31-17 (+B2)
Always
Below 1 Ω
1J-2 - E30-11 (MREL)
Always
Below 1 Ω
1J-4 or E31-24 (+B) - Body ground
Always
10 kΩ or higher
1J-5 or E31-17 (+B2) - Body ground
Always
10 kΩ or higher
1J-2 or E30-11 (MREL) - Body ground
Always
10 kΩ or higher
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
Check the harness and connector between the No. 1 integration relay (MAIN relay) and body ground.
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
1J-3 - Body ground
Always
Below 1 Ω
Reinstall the No. 1 integration relay.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - MAIN RELAY)
7. INSPECT IGNITION SWITCH
Inspect the ignition switch (Click here ).
NG
OK
REPAIR OR REPLACE HARNESS OR CONNECTOR (BATTERY - IGNITION SWITCH, IGNITION SWITCH - ECM)