INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 Aug 2013 – Jul 2014 from Aug 2014
| 1. INSTALL TRANSFER ASSEMBLY |
Install the transfer to the transmission.
Install the clamp and 8 bolts.
- Torque:
- 24 N*m{ 244 kgf*cm , 17 ft.*lbf }
| 2. INSTALL MANUAL TRANSMISSION ASSEMBLY (for Manual Transmission) |
G58F:
Install the manual transmission (Click here).
R150F/R151F/R156F:
Install the manual transmission (Click here).
| 3. INSTALL AUTOMATIC TRANSMISSION ASSEMBLY (for Automatic Transmission) |
A340F:
Install the automatic transmission (Click here).
A750F (for 1GR-FE):
Install the automatic transmission (Click here).
A750F (for 1KD-FTV):
Install the automatic transmission (Click here).
A343F:
Install the automatic transmission (Click here).
| 4. INSTALL LOWER TRANSFER CASE PROTECTOR |
![]() ![]() |
Install the protector with the 4 bolts.
- Torque:
- 18 N*m{ 183 kgf*cm , 13 ft.*lbf }
| 5. ADD TRANSFER OIL |
Remove the case plug (for filler) and gasket.
Pour oil so that the oil level is between 0 to 5.0 mm (0 to 0.197 in.) from the bottom lip of the case plug (for filler) hole.
- NOTICE:
- When adding oil, pour it slowly.
- Add oil a little at a time, waiting several minutes between each addition of oil.
- When adding oil, pour it slowly.
Wait approximately 5 minutes and check that the oil level has not changed.
Install a new gasket and the case plug (for filler).
- Torque:
- 37 N*m{ 377 kgf*cm , 27 ft.*lbf }
| 6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 7. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


