2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL STARTER ASSEMBLY

  1. A122692E01
    Connect the ground cable and install the starter with the 2 nuts and bolt.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

    HINT:
    Make sure to connect the ground cable with the nut as shown in the illustration.

  1. Install the starter wire to terminal 30 with the nut.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Connect the starter connector.


2. INSTALL CLUTCH RELEASE CYLINDER ASSEMBLY (for Manual Transmission)

G034223E01
  1. Install the release cylinder with the 2 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }


3. INSTALL FRONT FENDER SEAL
  1. Install the seal with the 5 clips.


4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← REASSEMBLY (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →