INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. CLEAN TURBOCHARGER SUB-ASSEMBLY |
| 2. INSTALL TURBOCHARGER SUB-ASSEMBLY |
Temporarily install a new gasket and the turbocharger with 3 new nuts.

- HINT:
- When installing the turbo oil pipe, loosely tighten the 3 nuts so that the turbocharger and cylinder head can be aligned easily.
Temporarily install the turbo oil pipe and manifold stay.
- HINT:
- Wash the oil pipe before installing it.
Temporarily install a new gasket and the oil pipe with the 2 nuts, but only loosely install the nuts.

- NOTICE:
- The notch (wide part) of the gasket must face the engine.
Temporarily install a new gasket and the oil pipe with the 2 bolts (labeled: A), but only loosely install the bolts.

- NOTICE:
- The claws of the gasket must face the pipe.
Temporarily install a new gasket and the oil pipe with the union bolt (labeled: B), but only loosely install the union bolt.
Temporarily install the stay with the 2 bolts.
- HINT:
- The stay's indented area must face the turbocharger.
Tighten the bolts and nuts.
Tighten the 3 nuts of the turbocharger.
- Torque:
- 52 N*m{ 530 kgf*cm , 38 ft.*lbf }
Tighten the 2 nuts of the oil pipe.
- Torque:
- 13 N*m{ 133 kgf*cm , 10 ft.*lbf }
Tighten the 2 bolts of the oil pipe.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
Tighten the union bolt.
- Torque:
- 26 N*m{ 265 kgf*cm , 19 ft.*lbf }
Tighten the 2 bolts of the stay.
- Torque:
- 19 N*m{ 194 kgf*cm , 14 ft.*lbf }


| 3. INSTALL TURBINE OUTLET ELBOW |
![]() ![]() |
Temporarily install a new gasket and the outlet elbow (with turbocharger stay) to the turbocharger with the 4 nuts.
Temporarily install the stay with the 2 bolts.
Tighten the 4 nuts of the turbocharger.
- Torque:
- 26 N*m{ 265 kgf*cm , 19 ft.*lbf }
Tighten the 2 bolts of the stay.
- Torque:
- 24 N*m{ 245 kgf*cm , 18 ft.*lbf }
| 4. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY |
![]() ![]() |
Connect the pipe (with the 2 air hoses) and install the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Tighten the 2 clamps of the No. 1 and No. 2 air hoses.
- Torque:
- 6.5 N*m{ 66 kgf*cm , 57 in.*lbf }
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
| 5. INSTALL VENTILATION HOSE HEAT INSULATOR |
Install the insulator with the 2 bolts.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
| 6. INSTALL AIR CLEANER ASSEMBLY |
w/o Mass Air Flow Meter:
Connect the air cleaner hose.

Install the air cleaner with the 2 bolts.
- Torque:
- 14 N*m{ 143 kgf*cm , 10 ft.*lbf }
Tighten the clamp.
Install the clamp and connect the intake air temperature sensor connector.
Connect the ventilation hose.
Slide the clamp to the connection of the hose.
w/ Mass Air Flow Meter:
Connect the air cleaner hose.
Install the air cleaner with the 2 bolts.

- Torque:
- 14 N*m{ 143 kgf*cm , 10 ft.*lbf }
Connect the connector to the mass air flow meter.
Tighten the hose clamp.
| 7. INSTALL FRONT EXHAUST PIPE ASSEMBLY |
Using a vernier caliper, measure the free length of the compression spring.

- Minimum length:
- 40 mm (1.57 in.)
Install the front pipe to the pipe support.
Install a new gasket to the outlet pipe.

- NOTICE:
- Be careful with the installation direction of the gasket.
- Be careful with the installation direction of the gasket.
- Do not reuse the gasket.
- Do not reuse the gasket.
- To ensure a proper seal, do not use the front pipe to force the gasket onto the outlet pipe.
- To ensure a proper seal, do not use the front pipe to force the gasket onto the outlet pipe.
- HINT:
- Using a plastic-faced hammer, uniformly strike the gasket so that the gasket and outlet pipe are properly fit.
Install the front pipe with the 2 compression springs and 2 bolts. Alternately tighten the bolts in several passes.
- Torque:
- 43 N*m{ 438 kgf*cm , 32 ft.*lbf }
- CAUTION:
- Do not reuse the gasket.
| 8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 9. CHECK FOR ENGINE OIL LEAKS |
| 10. CHECK FOR EXHAUST LEAKS |
| 11. INSTALL FRONT FENDER APRON SEAL UPPER |
Install the apron seal with the 5 clips.
| 12. INSTALL FRONT FENDER SEAL |
Install the fender seal with the 5 clips.
| 13. INSTALL FRONT WHEEL RH |
| 14. INSTALL NO. 1 ENGINE UNDER COVER |
Install the cover with the 4 bolts.
- Torque:
- 28 N*m{ 286 kgf*cm , 21 ft.*lbf }
| 15. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


