INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL VACUUM SWITCHING VALVE BRACKET |
Install the bracket (with E-VRV) with the 2 bolts.

- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the vacuum hose to the 2 locations.
Connect the connector.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 3. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
