2014 Hilux · Service Manual ENGINE

DISASSEMBLY

Removal / installation · Vehicles built from Jun 2011


1. MOUNT INJECTION PUMP

  1. B013328E01
    Mount the injection pump to SST.
    SST
    09241-76022  
    09245-54010  


2. REMOVE NO. 4 NOZZLE LEAKAGE PIPE

  1. A070790E01
    Remove the overflow screw, nozzle leakage pipe and 2 washers.


3. REMOVE FUEL FILTER TO INJECTION PUMP FUEL PIPE
  1. Remove the cap nut, fuel pipe and 2 washers.

  1. Remove the fuel inlet hollow screw and washer.


4. REMOVE TIMING CONTROL VALVE

  1. B013327E01
    Using a 5 mm hexagon wrench, remove the 2 bolts and timing control valve.


5. REMOVE FUEL TEMPERATURE SENSOR

  1. B013326E01
    Using a 19 mm deep socket wrench, remove the fuel temperature sensor.


6. REMOVE DISTRIBUTIVE HEAD PLUG

  1. B013112E01
    Using SST, remove the distributive head plug.
    SST
    09260-54012   (09262-54010)


7. REMOVE DELIVERY VALVE

  1. B013113E01
    Using SST, remove the 4 delivery valve holders and springs.
    SST
    09260-54012   (09269-54020)

  1. Remove the 4 delivery valves and gaskets.

    NOTICE:
    Do not touch the sliding surfaces of the delivery valve with your hand.

    HINT:
    Arrange the delivery valves, springs, and holders in the order they were removed.

← REMOVAL (from Jun 2011)INSPECTION (from Jun 2011) →