Home › ENGINE › 1KD-FTV ENGINE CONTROL SYSTEM › ECD SYSTEM (w/ EGR Cooler)
Injector Circuit
Circuit diagnosis · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 Aug 2013 – Jul 2014 from Aug 2014
DESCRIPTION
The injector driver drives the injectors at high speeds with a high-voltage DC/DC converter. The ECM constantly monitors the injector driver and stops the engine if an abnormal condition is detected. WIRING DIAGRAM
Refer to DTC P0200 (Click here ). INSPECTION PROCEDURE
NOTICE:
After replacing the ECM, the new ECM needs registration (Click here ) and initialization (Click here ).
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
1. CHECK INJECTOR DRIVER (POWER SOURCE)
Disconnect the injector driver connectors.
Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
I17-2 (+B) - I17-3 (GND)
Ignition switch ON
11 to 14 V
Text in Illustration
*a
Front view of wire harness connector (to Injector Driver)
Reconnect the injector driver connector.
NG
OK
2. INSPECT NO. 1 INTEGRATION RELAY (EDU)
Inspect the No. 1 integration relay (EDU) (Click here ).
NG
REPLACE NO. 1 INTEGRATION RELAY (EDU)
OK
3. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY [EDU] - INJECTOR DRIVER)
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the injector driver connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
I17-2 (+B) - 1J-8
Always
Below 1 Ω
I17-3 (GND) - Body ground
Always
Below 1 Ω
I17-2 (+B) or 1J-8 - Body ground
Always
10 kΩ or higher
Reconnect the injector driver connector.
Reinstall the No. 1 integration relay.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK
4. CHECK HARNESS AND CONNECTOR (NO. 1 INTEGRATION RELAY - ECM)
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Tester Connection
Condition
Specified Condition
E5-10 (IREL) - 1J-7
Always
Below 1 Ω
E5-10 (IREL) or 1J-7 - Body ground
Always
10 kΩ or higher
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
NG
REPAIR OR REPLACE HARNESS OR CONNECTOR
OK