INSTALLATION
Removal / installation · Vehicles built from Aug 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
- HINT:
- Use the same procedure for RHD and LHD vehicles.
- The procedure listed below is for LHD vehicles.
- Use the same procedure for RHD and LHD vehicles.
| 1. INSTALL NO. 1 HEATER RELAY |
Install the No. 1 heater relay.
Attach the clamp to install the driver side junction block.
Install the 2 nuts.
| 2. INSTALL LOWER INSTRUMENT PANEL SUB-ASSEMBLY |
| 3. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY |
| 4. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).