When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.
After removing the injection pipes, clean them with a brush and compressed air.
1.INSTALL INTAKE MANIFOLD
Temporarily install a new gasket and the intake manifold with the 4 bolts and 2 nuts.
| *A | w/ EGR Cooler | *B | w/o EGR Cooler |
Tighten the 4 bolts and 2 nuts in the order shown in the illustration.
| *1 | No. 1 manifold insulator |
When installing the intake manifold, make sure that the No. 1 manifold insulator is not pinched.
Make sure that the swirl control valve actuator is not damaged by surrounding parts.
w/o EGR Cooler:
Connect the vacuum hose and connector to the vacuum switching valve.
w/ EGR Cooler:
Install the common rail sub-harness connector to the intake manifold.
2.INSTALL INTAKE MANIFOLD INSULATOR (w/ EGR Cooler)
| *1 | Intake Manifold |
| *2 | Intake Manifold Insulator |
| *3 | Common Rail |
Install the intake manifold insulator with the 2 bolts.
3.INSTALL NO. 3 INTERCOOLER SUPPORT BRACKET (w/ EGR Cooler)
Install the No. 3 intercooler support bracket with the bolt.
4.INSTALL NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
5.INSTALL NO. 4 INJECTION PIPE SUB-ASSEMBLY
6.INSTALL VACUUM CONTROL VALVE SET (w/ EGR Cooler)
| *1 | Pink Paint Mark |
| *2 | White Paint Mark |
Install the vacuum control valve set with the 2 bolts.
Connect the 3 vacuum hoses and 2 connectors.
When connecting the hoses, match the colors of the paint marks on the hoses to the colors of the paint marks on the swirl control valve as shown in the illustration.
7.INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE SUB-ASSEMBLY (w/o EGR Cooler)
8.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY (w/ EGR System without EGR Cooler)
9.INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY (w/ EGR System without EGR Cooler)
10.INSTALL INTAKE AIR CONNECTOR (w/o EGR Cooler)
Install a new gasket and the intake air connector with the bolt and 2 nuts.
11.INSTALL NO. 2 INTAKE AIR CONNECTOR BRACKET (w/o EGR Cooler)
Install the No. 2 intake air connector bracket with the 3 bolts.
12.INSTALL ELECTRIC VACUUM REGULATING VALVE ASSEMBLY (w/ EGR System without EGR Cooler)
13.INSTALL VACUUM SWITCHING VALVE BRACKET (w/o EGR System)
Install the vacuum switching valve bracket with the 2 bolts.
14.TEMPORARILY INSTALL ELECTRIC EGR CONTROL VALVE WITH NO. 2 EGR VALVE AND EGR COOLER (w/ EGR Cooler)
15.INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE
Install a new O-ring to the engine oil level dipstick guide.
Apply a small amount of clean engine oil to the O-ring.
Install the engine oil level dipstick guide with the bolt.
Install the injection pipe clamp with the bolt.
Install the engine oil level dipstick.
16.INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE (w/ EGR Cooler)
Install the manifold stay with vacuum switching valve with the 2 bolts.
Be sure to securely connect the vacuum transmitting hose.
| *1 | Pink Paint Mark |
| *2 | Yellow Paint Mark |
| *3 | Blue Paint Mark |
Connect the 4 vacuum transmitting hoses and 2 vacuum switching valve connector.
17.INSTALL MANIFOLD STAY (w/o EGR Cooler)
Install the manifold stay with vacuum switching valve with the 2 bolts.
The manifold stay indented area (labeled A) must face the manifold.
18.INSTALL DIESEL THROTTLE BODY ASSEMBLY
19.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
20.ADD ENGINE COOLANT (w/ EGR Cooler)
21.BLEED AIR FROM FUEL SYSTEM
22.INSPECT FOR FUEL LEAK
23.INSPECT FOR COOLANT LEAK (w/ EGR Cooler)
24.INSPECT FOR OIL LEAK
25.INSTALL NO. 1 ENGINE UNDER COVER (w/ EGR Cooler)