1.INSTALL TRANSFER ASSEMBLY
2.INSTALL TRANSMISSION CONTROL CABLEBRACKET
Install the transmission control cable bracket with the 2 bolts.
3.INSPECT TORQUE CONVERTER ASSEMBLY
4.INSTALL TORQUE CONVERTER ASSEMBLY
Engage the spline of the input shaft turbine runner.
Engage the spline of the stator shaft and the stator while turning the torque converter assembly.
If the stator shaft spline are difficult to engage with the stator splines, move the torque converter back approximately 10 mm (0.394 in.) and engage the splines while rotating the torque converter.
Turn the torque converter assembly to insert the key of the oil pump drive gear into the groove of the torque converter assembly.
Clean the torque converter set bolt holes.
Using a vernier caliper and straightedge, measure dimension A between the transaxle contact surface of the engine and the torque converter contact surface of the drive plate.
Make sure to deduct the thickness of the straightedge.
Using a vernier caliper and straightedge, measure dimension B shown in the illustration and check that dimension B is more than dimension A, which was measured in the previous step.
B = A + 1.00 mm (0.0394 in.) or more
Make sure to deduct the thickness of the straightedge.
If the transaxle is installed to the engine with the torque converter not sufficiently inserted, the torque converter may be damaged.
5.INSTALL AUTOMATIC TRANSMISSION ASSEMBLY
| *1 | Torque Converter Centerpiece |
| *2 | Crankshaft |
Apply clutch spline grease to the surface of the crankshaft that contacts the torque converter centerpiece.
Toyota Genuine Clutch Spline Grease or equivalent
Approximately 1 g (0.0353 oz.)
While keeping the engine and automatic transmission assembly horizontal, align the knock pins with the holes in the automatic transmission assembly and install the 7 bolts shown in the illustration.
Confirm that the 2 knock pins are installed to the engine cylinder block before installing the transmission.
Do not use excessive force to pry on the transmission assembly.
Insert the knock pins into the knock pin holes securely so that the end face of the transmission assembly fits close against the engine assembly before tightening the bolts.
Check that the torque converter rotates.
6.INSTALL MANIFOLD STAY
7.INSTALL DRIVE PLATE AND TORQUE CONVERTER SETTING BOLT
Turn the crankshaft to gain access to the installation locations of the 6 torque converter setting bolts and install each bolt while holding the crankshaft pulley bolt with a wrench.
Install the black bolt first, and then the 5 silver bolts.
Install the flywheel housing dust seal.
8.CONNECT WIRE HARNESS AND CONNECTOR
Connect the park/neutral position switch connector, transmission wire connector, 2 speed sensor connectors and transfer control side connector.
Attach the 5 harness clamps.
Install the heat insulator with the 2 bolts to the park/neutral position switch.
Tilt up the transmission.
Connect the ground cable with the nut.
9.INSTALL REAR NO. 1 ENGINE MOUNTING INSULATOR
Install the engine mounting insulator to the transmission with the 4 bolts.
10.INSTALL NO. 3 FRAME CROSSMEMBER SUB-ASSEMBLY
Install the No. 3 frame crossmember to the rear engine mounting insulator with the 4 bolts.
Install the frame crossmember with the 4 bolts and 4 nuts.
Connect the wire harness clamp to the No. 3 frame crossmember.
11.INSTALL STARTER ASSEMBLY
12.CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
Connect the control cable with a new clip.
Connect the control cable with the nut.
13.CONNECT OIL COOLER TUBE
Temporarily install the ends of the oil cooler tubes to the oil cooler tube unions by hand.
Close the 3 No. 2 oil cooler hose clamps and install the 3 bolts.
Using a union nut wrench, tighten the inlet and outlet tubes.
Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (See page General>INTRODUCTION>REPAIR INSTRUCTION>PRECAUTION).
14.INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSEMBLY
15.INSTALL PROPELLER SHAFT ASSEMBLY
16.INSTALL FRONT PROPELLER SHAFT ASSEMBLY
17.INSTALL FRONT EXHAUST PIPE ASSEMBLY
18.INSTALL TRANSFER HIGH AND LOW SHIFT LEVER ASSEMBLY
| *1 | Select Return Spring |
While pushing the select return spring to the left with the end of the transfer high and low shift lever, insert the end of the shift lever into the shift fork.
| *1 | Shift Lever Cap |
While holding down the shift lever cap, install the snap ring to install the transfer high and low shift lever.
Return the transfer front drive shift boot to its original position.
19.INSTALL SHIFT LEVER BOOT ASSEMBLY
Install the shift lever boot with the 4 screws.
20.ADD AUTOMATIC TRANSMISSION FLUID
Toyota Genuine ATF Type T-IV
21.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
22.INSPECT SHIFT LEVER POSITION
23.ADJUST SHIFT LEVER POSITION
24.CHECK FOR EXHAUST GAS LEAK
25.INSPECT AUTOMATIC TRANSMISSION FLUID
26.INSTALL NO. 3 ENGINE UNDER COVER
27.INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
28.INSTALL NO. 1 ENGINE UNDER COVER