1.INSTALL VACUUM PUMP BEARING
Using a press, press in a new bearing to the shaft.
2.INSTALL VACUUM PUMP SHAFT
Using SST and a press, press in the shaft to the housing.
Using snap ring pliers, install a new snap ring.
Make sure that the snap ring is firmly installed to the groove.
3.INSTALL VACUUM PUMP GEAR
Temporarily install the woodruff key and gear to the pump with the gear lock nut.
Mount the gear in a vise.
Place aluminum plates on the vise to prevent damage to the gear.
Tighten the gear lock nut.
4.INSTALL VACUUM PUMP BLADE
| *a | Round End |
Apply engine oil to the rotor, and install the rotor to the housing.
Install 5 new blades with the round ends facing outward.
Apply engine oil to the blades.
Make sure that the blades are flush with the rotor surface.
5.INSTALL VACUUM PUMP END COVER
Mount the pump in a vise.
Place aluminum plates on the vise to prevent damage to the pump.
Apply engine oil to 2 new O-rings.
Install the 2 O-rings.
Install the end cover and temporarily install the 3 bolts.
Using a 5 mm pin punch and hammer, tap in the 2 straight pins.
Tighten the 3 bolts.
6.INSTALL CHECK VALVE SUB-ASSEMBLY
Install a new gasket and the check valve.
Install 2 new gaskets and the union with the union bolt.
Insert the union pin into the hole of the casing.
7.INSTALL VACUUM PUMP ASSEMBLY
Install 2 new O-rings.
Install the pump to the engine with the 2 nuts.
Connect the 2 hoses to the pump with the clip.
8.INSTALL NO. 1 TIMING BELT COVER (for 1KD-FTV)
9.INSTALL NO. 1 TIMING BELT COVER (for 2KD-FTV)
10.REMOVE RADIATOR ASSEMBLY
for 1KD-FTV:
(See page Engine / Hybrid System>1KD-FTV COOLING>RADIATOR>INSTALLATION)
for 2KD-FTV:
(See page Engine / Hybrid System>2KD-FTV COOLING>RADIATOR>INSTALLATION)
11.CHECK VACUUM PUMP ASSEMBLY
12.INSTALL NO. 2 ENGINE UNDER COVER (for 4WD and Pre-Runner)
13.INSTALL NO. 1 ENGINE UNDER COVER (for 4WD and Pre-Runner)