Home › Engine / Hybrid System › 1KD-FTV ENGINE CONTROL › ECD SYSTEM(w/o EGR Cooler) › from 2012.10
RM1840EF _51 Engine / Hybrid System _009570 1KD-FTV ENGINE CONTROL _0052103 ECD SYSTEM(w/o EGR Cooler) C

1KD-FTV ENGINE CONTROL  ECD SYSTEM(w/o EGR Cooler)  P2009  Intake Manifold Runner Control Circuit Low (Bank 1)  P2010  Intake Manifold Runner Control Circuit High (Bank 1)  


DESCRIPTION

Refer to DTC P2006 (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>P2006).

DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory
P2009 Intake Manifold Runner Control Circuit Low (Bank 1) Open in vacuum switching valve (for swirl control valve) circuit for 0.5 seconds (2 trip detection logic).
·

Vacuum switching valve (for swirl control valve)

·

Open in vacuum switching valve (for swirl control valve) circuit

·

ECM


Comes on DTC stored
P2010 Intake Manifold Runner Control Circuit High (Bank 1) Short in vacuum switching valve (for swirl control valve) circuit for 0.5 seconds (2 trip detection logic).
·

Vacuum switching valve (for swirl control valve)

·

Short in vacuum switching valve (for swirl control valve) circuit

·

ECM


Comes on DTC stored

CONFIRMATION DRIVING PATTERN

P2009, P2010
DTC Detection Drive Pattern 2 seconds after engine is started, race engine for 1 second

CAUTION / NOTICE / HINT

NOTICE:

After replacing the ECM, the new ECM needs registration (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>REGISTRATION) and initialization (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>INITIALIZATION).


HINT:

Read freeze frame data using the intelligent tester. Freeze frame data records the engine condition when a malfunction is detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, and other data from the time the malfunction occurred.


PROCEDURE

1.PERFORM ACTIVE TEST USING INTELLIGENT TESTER (ACTIVATE THE VSV FOR SWIRL CONTROL VALVE)
a.
A208635
0.24,1.771 0.333,1.469 true 0.854,1.802 0.542,1.396 true 2.563,1.781 1.979,1.406 true 1.729,1.813 1.792,1.448 true 0.49,0.052 1.25,0.302 0.76,0.25 10 false VSV is ON 2.021,0.052 2.938,0.333 0.917,0.281 10 false VSV is OFF 0.646,0.458 0.948,0.75 0.302,0.292 10 false Air 2.094,0.438 2.396,0.729 0.302,0.292 10 false Air 2.625,1.719 3.125,1.979 0.5,0.26 10 false Port E 2.656,0.573 3.323,0.833 0.667,0.26 10 false Air Filter 1.771,1.75 2.271,2.01 0.5,0.26 10 false Port F 0.115,1.771 0.615,2.031 0.5,0.26 10 false Port F 0.885,1.75 1.385,2.01 0.5,0.26 10 false Port E

Connect the intelligent tester to the DLC3.


b.

Disconnect the vacuum hoses from the vacuum switching valve (for Swirl Control Valve).


c.

Turn the ignition switch to ON and turn the tester on.


d.

Enter the following menus: Powertrain / Engine and ECT / Active Test / Activate the VSV for Swirl Control Valve.

Powertrain > Engine > Active Test
Tester Display
Activate the VSV for Swirl Control Valve
50004 61 43

e.

Check the VSV operation when it is operated using the intelligent tester.

OK:
Tester Operation Specified Condition
VSV ON Air from port E flows out through port F
VSV OFF Air from port E flows out through air filter



f.

Reconnect the vacuum hoses.


Result:
Proceed to
OK
NG



OK

NG

2.INSPECT VACUUM SWITCHING VALVE FOR SWIRL CONTROL VALVE (RESISTANCE)
2.INSPECT VACUUM SWITCHING VALVE FOR SWIRL CONTROL VALVE (RESISTANCE)
a.

Inspect the vacuum switching valve (for swirl control valve).

Click hereEngine / Hybrid System>1KD-FTV INTAKE / EXHAUST>INTAKE MANIFOLD(w/o Glow Plug Controller)>INSPECTION


Result:
Proceed to
OK
NG



OK

3.INSPECT VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE) (POWER SOURCE VOLTAGE)

NG

6.REPLACE VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE)
3.INSPECT VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE) (POWER SOURCE VOLTAGE)
a.
A154589
0.854,1.302 1.229,1.552 0.375,0.25 0.167,0.198 0.448,0.406 0.281,0.208 10 false *a 0.917,1.344 1.208,1.51 0.292,0.167 10 false C42
*a Front view of wire harness connector
(to Vacuum Switching Valve [for Swirl Control Valve])


Disconnect the vacuum switching valve (for swirl control valve) connector.


b.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
C42-2 - Body ground Ignition switch ON 11 to 14 V



Result:
Proceed to
OK
NG



OK

4.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE [FOR SWIRL CONTROL VALVE] - ECM)

NG

7.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE [FOR SWIRL CONTROL VALVE] - NO. 1 INTEGRATION RELAY)
4.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE [FOR SWIRL CONTROL VALVE] - ECM)
a.

Disconnect the vacuum switching valve (for swirl control valve) connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
C42-1 - C22-15 (SCV) Always Below 1 Ω
C42-1 or C22-15 (SCV) - Body ground Always 10 kΩ or higher



d.

Reconnect the vacuum switching valve (for swirl control valve) connector.


e.

Reconnect the ECM connector.


Result:
Proceed to
OK
NG



OK

5.REPLACE ECM

NG

9.REPAIR OR REPLACE HARNESS OR CONNECTOR
5.REPLACE ECM

Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
6.REPLACE VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE)
a.

Replace the vacuum switching valve (for swirl control valve).

Click hereEngine / Hybrid System>1KD-FTV INTAKE / EXHAUST>INTAKE MANIFOLD(w/o Glow Plug Controller)>REMOVAL


Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
7.CHECK HARNESS AND CONNECTOR (VACUUM SWITCHING VALVE [FOR SWIRL CONTROL VALVE] - NO. 1 INTEGRATION RELAY)
a.

Remove the No. 1 integration relay from the engine room relay block and junction block assembly.


b.

Disconnect the No. 1 integration relay connector.


c.

Disconnect the vacuum switching valve (for swirl control valve) connector.


d.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
1J-5 - C42-2 Always Below 1 Ω
1J-5 or C42-2 - Body ground Always 10 kΩ or higher



e.

Reinstall the No. 1 integration relay.


f.

Reconnect the No. 1 integration relay connector.


g.

Reconnect the vacuum switching valve (for swirl control valve) connector.


Result:
Proceed to
OK
NG



OK

8.INSPECT ECM POWER SOURCE CIRCUIT

NG

9.REPAIR OR REPLACE HARNESS OR CONNECTOR
8.INSPECT ECM POWER SOURCE CIRCUIT

Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
9.REPAIR OR REPLACE HARNESS OR CONNECTOR
a.

Repair or replace harness or connector.


Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
a.

Connect the intelligent tester to the DLC3.


b.

Clear the DTCs.

Click hereEngine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>DTC CHECK / CLEAR

Powertrain > Engine > Clear DTCs
50002 61

c.

Start the engine and wait for 3 seconds or more.


d.

Enter the following menus: Powertrain / Engine and ECT / DTC.

Powertrain > Engine > Trouble Codes
50001 61

e.

Confirm that the DTC is not output again.


Result:
Proceed to
NEXT



NEXT

END