83910G
1.INSTALL CLOCK ASSEMBLY
Attach the claw to install the clock assembly.
Install the screw.
55670A
2.INSTALL CENTER INSTRUMENT PANEL REGISTER ASSEMBLY
55844
3.INSTALL NO. 2 HEATER TO REGISTER DUCT
55085
4.INSTALL NO. 2 HEATER TO REGISTER DUCT SUB-ASSEMBLY
55084E
5.INSTALL NO. 1 HEATER TO REGISTER DUCT SUB-ASSEMBLY
55950G
6.INSTALL DEFROSTER NOZZLE ASSEMBLY
55302A
7.INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY
8.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION
9.CHECK SRS WARNING LIGHT