The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed, installed or replaced during the cylinder head gasket removal/installation are shown below.
To prevent burns, do not touch the engine, exhaust manifold or other high temperature components while the engine is hot.
13511
1.REMOVE CAMSHAFT
17141
2.REMOVE EXHAUST MANIFOLD
26100
3.REMOVE VENTURI ASSEMBLY
87245A
4.DISCONNECT HEATER WATER HOSE SUB-ASSEMBLY
23701
5.REMOVE INJECTION PIPE SUB-ASSEMBLY
6.DISCONNECT WIRE HARNESS
| *1 | Nut |
| *2 | Plate Washer |
| *3 | No. 2 Glow Plug Resistor Insulator |
| *4 | Wire Harness |
Remove the nut, plate washer and No. 2 glow plug resistor insulator and disconnect the wire harness.
Disconnect the engine coolant temperature sensor connector.
Detach the 7 wire harness clamps and disconnect the wire harness.
23770B
7.DISCONNECT FUEL HOSE
Slide the clamp and disconnect the fuel hose from the nozzle leakage pipe assembly.
11101
8.REMOVE CYLINDER HEAD SUB-ASSEMBLY
Uniformly loosen and remove the 18 cylinder head set bolts in several steps in the sequence shown.
Cylinder head warpage or cracking could result from removing bolts in the incorrect order.
Lift the cylinder head sub-assembly from the dowels on the cylinder block sub-assembly, and place the cylinder head sub-assembly on wooden blocks on a bench.
Be careful not to damage the contact surfaces of the cylinder head sub-assembly and cylinder block sub-assembly.
If the cylinder head sub-assembly is difficult to lift, use a screwdriver to pry between the cylinder head sub-assembly and cylinder block sub-assembly.
11101A
9.INSPECT CYLINDER HEAD SET BOLT
11115
10.REMOVE CYLINDER HEAD GASKET