While the engine is being cranked, current flows from terminal ST2 of the ignition switch through the park/neutral position switch (for A/T) or directly (for M/T) to terminal STA of the ECM (STA signal).
Inspect the fuses for circuits related to this system before performing the following procedure.
This inspection procedure is based on the premise that the engine can crank normally. If the engine cannot crank normally, proceed to the problem symptoms table (See page Engine / Hybrid System>2TR-FE ENGINE CONTROL>SFI SYSTEM>PROBLEM SYMPTOMS TABLE).
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the intelligent tester on.
Enter the following menus: Powertrain / Engine and ECT / Data List / Starter Signal.
| Tester Display |
|---|
| Starter Signal |
Read the value.
| Ignition Switch Position | Starter Signal |
|---|---|
| ON | Close (Starter signal OFF) |
| START | Open (Starter signal ON) |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the starter (ST) relay from the engine room relay block and junction block.
| *1 | Starter (ST) Relay |
| *2 | Engine Room Relay Block and Junction Block Assembly |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Starter (ST) relay terminal 2 - Body ground | Engine cranking | 11 to 14 V |
The engine does not crank because the relay is not installed.
| Result | Proceed to |
|---|---|
| OK | A |
| NG (for Manual Transaxle) | B |
| NG (for Automatic Transaxle) | C |
A
B
C
Inspect the starter (ST) relay.
Click hereEngine / Hybrid System>2TR-FE STARTING>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the starter (ST) relay from the engine room relay block and junction block.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Starter (ST) relay terminal 1 - Body ground | Always | Below 1 Ω |
| Result | Proceed to |
|---|---|
| OK (for Manual Transaxle) | A |
| OK (for Automatic Transaxle) | B |
| NG | C |
A
B
C
Remove the starter (ST) relay from the engine room relay block and junction block.
Disconnect the ignition switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| Starter (ST) relay terminal 2 - G9-7 (ST2) | Always | Below 1 Ω |
| Starter (ST) relay terminal 2 or G9-7 (ST2) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the ignition switch assembly.
Click hereEngine / Hybrid System>2TR-FE STARTING>IGNITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the starter (ST) relay from the engine room relay block and junction block.
Disconnect the park/neutral position switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| ST relay terminal 2 - C26-5 (L) | Always | Below 1 Ω |
| ST relay terminal 2 or C26-5 (L) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the park/neutral position switch assembly.
Click hereDrivetrain>A343E AUTOMATIC TRANSMISSION / TRANSAXLE>PARK / NEUTRAL POSITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Click hereDrivetrain>A343E AUTOMATIC TRANSMISSION / TRANSAXLE>PARK / NEUTRAL POSITION SWITCH>REMOVAL
Disconnect the park/neutral position switch connector.
Disconnect the ignition switch connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C26-4 (B) - G9-7 (ST2) | Always | Below 1 Ω |
| C26-4 (B) or G9-7 (ST2) - Body ground | Always | 10 kΩ or higher |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the ignition switch assembly.
Click hereEngine / Hybrid System>2TR-FE STARTING>IGNITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG