2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REMOVAL

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. REMOVE TIMING BELT
  1. Remove the timing belt (Click here).


2. REMOVE DIESEL THROTTLE BODY
  1. Remove the diesel throttle body (Click here).


3. REMOVE INJECTION PIPE SET

  1. A121940E03
    Using a union nut wrench, loosen the 8 union nuts of the 4 injection pipes.
    Text in Illustration 
    *1
    Union Nut Wrench
    *a
    for Injection Nozzle Side
    *b
    for Injection Pump Side

  1. Remove the 2 nuts, 2 upper pipe clamps and 4 injection pipes with 2 lower pipe clamps.


4. REMOVE INJECTION PUMP DRIVE PULLEY

  1. A071313E01
    Using SST, remove the pulley nut.
    SST
    09213-14010   (91651-60865)
    09330-00021  

  1. A071314E01
    Using SST, remove the drive pulley.
    SST
    09950-50013   (09951-05010, 09952-05010, 09953-05010, 09954-05021)


5. REMOVE INJECTION PUMP ASSEMBLY

  1. A227188
    Disconnect the 5 connectors and detach the wire harness clamp.

  1. Disconnect the 3 fuel hoses.

  1. A223860
    Remove the 3 bolts and injection pump stay.

  1. Remove the 2 nuts and injection pump.

← REMOVAL (Aug 2013 – Jul 2014)DISASSEMBLY (from Aug 2013) →