2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL NOZZLE HOLDER AND NOZZLE SET

  1. A122389E01
    Install 4 new injection nozzle seat gaskets and the 4 injection nozzle seats to the injection nozzle holes of the cylinder head.

  1. Using SST, install the 4 nozzle holder and nozzle sets.

    SST
    09268-64010   (09268-64020)

    Torque:
    64 N*m{ 650 kgf*cm , 47 ft.*lbf }


2. INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY
  1. Install 4 new ring packing washers and the leakage pipe with the 4 nuts.

    Torque:
    30 N*m{ 301 kgf*cm , 22 ft.*lbf }

  1. Connect the fuel hose to the leakage pipe.


3. INSTALL NO. 1 GLOW PLUG CONNECTOR
  1. Install the No. 1 glow plug resistor insulator and No. 1 glow plug connector.

  1. A224319E01
    Install the glow plug connector with the 4 nuts. Uniformly tighten the nuts.

    Torque:
    1.0 N*m{ 10 kgf*cm , 9 in.*lbf }

    Text in Illustration 
    *1
    Nut
    *2
    Washer
    *3
    No. 2 Glow Plug Resistor Insulator
    *4
    Engine Wire
    *5
    No. 1 Glow Plug Connector
    *6
    No. 1 Glow Plug Resistor Insulator
    *7
    Bolt

  1. Install the 4 screw grommets.

  1. Connect the engine wire and install the No. 2 glow plug resistor insulator and washer with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


4. INSTALL INJECTION PIPE SET
  1. Install the 2 lower clamps to the intake manifold.

  1. A230069E01
    Install the 4 injection pipes.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

    Text in Illustration 
    *a
    for Injection Nozzle Side
    *b
    for Injection Pump Side

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Install the 2 upper pipe clamps with the 2 nuts.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }


5. INSTALL DIESEL THROTTLE BODY
  1. Install the diesel throttle body (Click here).


6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


7. BLEED INJECTION PIPE
  1. Move the hand pump on the upper part of the fuel filter up and down and fill the injection pump and fuel system with fuel.

  1. Loosen one of the union nuts (on the nozzle side).

  1. Crank the engine until fuel comes out from the union nut connection (on the nozzle side).

  1. Tighten the union nut.

    Torque:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Use the formula to calculate special torque values for situations where a union nut wrench is combined with a torque wrench (Click here).

  1. Perform the procedures above for each injection pipe.


8. INSPECT FOR FUEL LEAK
  1. Check that there are no fuel leaks anywhere in the fuel system after performing maintenance.

    HINT:
    When checking for fuel leaks, make sure that there is pressure in the fuel line.

← INSTALLATION (Aug 2013 – Jul 2014)COMPONENTS (from Aug 2013) →