2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2013


1. INSTALL DIESEL THROTTLE BODY ASSEMBLY
  1. Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the throttle position sensor connector.


2. INSTALL NO. 1 INTAKE PIPE
  1. Connect the No. 1 intake pipe with the air hose and install the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Tighten the clamp of the intercooler air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Connect the vacuum hose to the manifold absolute pressure sensor connector.

  1. Connect the 3 connectors to the intake air temperature sensor, throttle control motor and manifold absolute pressure sensor.

  1. Attach the 2 clamps.


3. CONNECT NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY
  1. Connect the No. 4 vacuum transmitting pipe with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


4. CONNECT INLET HEATER WATER HOSE
  1. Connect the inlet heater water hose with the bolt.

    Torque:
    26 N*m{ 260 kgf*cm , 19 ft.*lbf }

← REMOVAL (from Aug 2013)ON-VEHICLE INSPECTION (from Aug 2013) →