2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL STARTER ASSEMBLY
  1. Install the starter assembly with the 2 bolts and nut.

    Torque:
    68 N*m{ 693 kgf*cm , 50 ft.*lbf }

  1. Connect the starter wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Connect the starter connector.


2. CONNECT CLUTCH FLEXIBLE HOSE BRACKET
  1. Connect the clutch flexible hose bracket with the bolt.

    Torque:
    72 N*m{ 730 kgf*cm , 53 ft.*lbf }


3. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY
  1. Connect the release cylinder with the 2 bolts.

    Torque:
    12 N*m{ 120 kgf*cm , 9 ft.*lbf }


4. INSTALL REAR ENGINE UNDER COVER ASSEMBLY
  1. Install the rear engine under cover with the 4 bolts.

    Torque:
    29 N*m{ 296 kgf*cm , 21 ft.*lbf }


5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).

← REASSEMBLY (from Aug 2013)INSTALLATION (from Aug 2014) →