INSTALLATION
Removal / installation · Vehicles built from Aug 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
| 1. INSTALL STARTER ASSEMBLY |
Install the starter assembly with the 2 bolts and nut.
- Torque:
- 68 N*m{ 693 kgf*cm , 50 ft.*lbf }
Connect the starter wire with the nut.
- Torque:
- 9.8 N*m{ 100 kgf*cm , 87 in.*lbf }
Install the terminal cap.
Connect the starter connector.
| 2. CONNECT CLUTCH FLEXIBLE HOSE BRACKET |
Connect the clutch flexible hose bracket with the bolt.
- Torque:
- 72 N*m{ 730 kgf*cm , 53 ft.*lbf }
| 3. CONNECT CLUTCH RELEASE CYLINDER ASSEMBLY |
Connect the release cylinder with the 2 bolts.
- Torque:
- 12 N*m{ 120 kgf*cm , 9 ft.*lbf }
| 4. INSTALL REAR ENGINE UNDER COVER ASSEMBLY |
Install the rear engine under cover with the 4 bolts.
- Torque:
- 29 N*m{ 296 kgf*cm , 21 ft.*lbf }
| 5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
- NOTICE:
- When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
