REASSEMBLY
Removal / installation · Vehicles built from Aug 2013
| 1. INSTALL DELIVERY VALVE HOLDER |
Install 4 new gaskets and the 4 valves to the distributive head.

Install the 4 springs to the 4 delivery valve holders.
Using SST, install the delivery holders.
- SST
- 09260-54012
(09269-54020)
- Torque:
- 59 N*m{ 600 kgf*cm , 43 ft.*lbf }
| 2. INSTALL DISTRIBUTIVE HEAD PLUG |
Install a new O-ring to the distributive head plug.

Using SST, install the head plug.
- SST
- 09260-54012
(09262-54010)
- Torque:
- 88 N*m{ 900 kgf*cm , 65 ft.*lbf }
| 3. INSTALL TIMING CONTROL VALVE |
Using a 5 mm hexagon wrench, install the timing control valve with the 2 bolts.

Text in Illustration *1
5 mm Hexagon Wrench
| 4. INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE |
Install a new washer and the hollow screw.

- Torque:
- 37 N*m{ 375 kgf*cm , 27 ft.*lbf }
Install 2 new washers and the fuel pipe with the cap nut.
- Torque:
- 27 N*m{ 271 kgf*cm , 20 ft.*lbf }
Install the wiring bracket with the bolt.
- Torque:
- 8.0 N*m{ 82 kgf*cm , 71 in.*lbf }
| 5. INSTALL NO. 4 NOZZLE LEAKAGE PIPE |
Install 2 new washers and the nozzle leakage pipe with the overflow screw.
- Torque:
- 27 N*m{ 271 kgf*cm , 20 ft.*lbf }
