18 (5) Spill Control Circuit Malfunction
Diagnostic trouble codes · Vehicles built Aug 2013 – Jul 2014
Versions by build date: Aug 2013 – Jul 2014 from Aug 2014
DESCRIPTION
The ECM operates the spill control valve to control the fuel injection volume. The spill control valve is mounted on the injection pump. The spill control valve's solenoid valve opens and closes the injection pressure release port. During fuel injection, the spill control valve is on (closed). The ECM determines the basic fuel injection amount based on the engine speed and accelerator pedal position. Then the ECM uses several other correctional factors to determine the final fuel injection amount. After fuel injection has begun, the ECM ensures the final fuel injection amount by performing the following: 1) by counting the number of NE signals, and 2) by turning the spill control valve from on (closed) to off (open) (injection pressure release port is open).

| DTC No. |
DTC Detection Condition |
Trouble Area |
| 18 (5) |
Open or short in the spill control valve circuit at 500 rpm or more. |
|
WIRING DIAGRAM


INSPECTION PROCEDURE
| 1. INSPECT SPILL CONTROL VALVE |
Inspect the spill control valve (Click here).
|
|
||||
| OK | |
| 2. CHECK ECM (SPV+ VOLTAGE) |
Disconnect the spill control valve connector.

Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
C101-12 (SPV+) - C101-14 (E1)
Ignition switch ON
11 to 14 V
Text in Illustration *a
Component with harness connected
(ECM)
Reconnect the spill control valve connector.
|
|
||||
| OK | |
| 3. CHECK ECM (SPV- VOLTAGE) |
Turn the ignition switch to ON.

Measure the voltage according to the value(s) in the table below.
- Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
C101-25 (SPV-) - C101-14 (E1)
Ignition switch ON
11 to 14 V
While idling, check the waveform with an oscilloscope connected between the specified terminals of the ECM connector.
- OK:
Tester Connection
Condition
Specified Condition
C101-25 (SPV-) - C101-14 (E1)
Idling
Correct waveform is as shown
Text in Illustration *a
Component with harness connected
(ECM)
*b
SPV- signal waveform
|
|
||||
| OK | ||
| ||
| 4. CHECK HARNESS AND CONNECTOR (ECM - SPILL CONTROL VALVE) |
Disconnect the spill control valve connector.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
- Standard Resistance (Check for Open):
Tester Connection
Condition
Specified Condition
C106-2 - C101-12 (SPV+)
Always
Below 1 Ω
C106-1 - C101-25 (SPV-)
Always
Below 1 Ω
- Standard Resistance (Check for Short):
Tester Connection
Condition
Specified Condition
C106-2 or C101-12 (SPV+) - Body ground
Always
10 kΩ or higher
C106-1 or C101-25 (SPV-) - Body ground
Always
10 kΩ or higher
Reconnect the spill control valve connector.
Reconnect the ECM connector.
|
|
||||
| OK | ||
| ||
