2013-2015 Land Cruiser Prado · Service Manual Drivetrain

INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL TRANSFER ASSEMBLY
  1. for 1KD-FTV:
    Install the transfer assembly with the 8 bolts and 2 brackets.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Take care not to damage the adaptor rear oil seal with the transfer input gear spline.

  1. except 1KD-FTV:
    Install the transfer assembly with the 8 bolts and bracket.

    Torque:
    24 N*m{ 245 kgf*cm , 18 ft.*lbf }

    NOTICE:
    Take care not to damage the adaptor rear oil seal with the transfer input gear spline.


2. INSTALL AUTOMATIC TRANSMISSION WITH TRANSFER
  1. for A343F:

    1. Install the automatic transmission with transfer (Click here).

  1. for 1GR-FE, A750F:

    1. Install the automatic transmission with transfer (Click here).

  1. for 1KD-FTV, A750F:

    1. Install the automatic transmission with transfer (Click here).


3. INSTALL MANUAL TRANSMISSION WITH TRANSFER
  1. for G52F:

    1. Install the manual transmission with transfer (Click here).

  1. for R150F:

    1. Install the manual transmission with transfer (Click here).

  1. for 1GR-FE, RA61F:

    1. Install the manual transmission with transfer (Click here).

  1. for 1KD-FTV, RA61F:

    1. Install the manual transmission with transfer (Click here).


4. ADD TRANSFER OIL
  1. Remove the filler plug and gasket.

  1. Add oil so that the oil level is between 0 to 5.0 mm (0 to 0.196 in.) from the bottom lip of the filler plug hole.

    NOTICE:
    1. Add oil slowly.
    2. Add oil a little at a time, waiting several minutes between each addition of oil.

  1. Wait approximately 5 minutes and check that the oil level has not changed.

  1. Install a new gasket to the filler plug and then tighten the plug.

    Torque:
    37 N*m{ 377 kgf*cm , 27 ft.*lbf }


5. CHECK FOR TRANSFER OIL LEAK
← REASSEMBLY (from Aug 2014)INSTALLATION (from Aug 2014) →