2013-2015 Land Cruiser Prado · Service Manual Steering

INSPECTION

Inspection · Vehicles built from Aug 2013


INSPECT TIE ROD END SUB-ASSEMBLY

  1. ZK08184
    Install the nut.

  1. Flip the ball joint stud back and forth 5 times as shown in the illustration.

  1. Using a torque wrench, turn the nut continuously at a rate of 3 to 5 seconds per turn and check the torque reading on the 5th turn.

    Standard Torque:
    1.0 to 3.9 N*m (10 to 39 kgf*cm, 9 to 34 in.*lbf)


INSPECT TOTAL PRELOAD

  1. C216927E01
    Place matchmarks as shown in the illustration.
    Text in Illustration 
    *a
    Matchmark

  1. Temporarily install the 2 steering rack ends to the steering rack.

    NOTICE:
    Do not fully turn the steering rack without the steering rack ends installed as it may damage the oil seal in the rack housing.

  1. C215760E01
    Using SST, fully turn the steering rack right and left 10 times to settle it.
    SST
    09616-00011  

  1. C215761E01
    Using SST, turn the control valve and measure the preload.
    SST
    09616-00011  

    Standard preload (turning):
    Body Type
    Engine Type
    Specified Condition
    for 5 Door
    for 1GR, 2TR and 1KD
    1.6 to 2.3 N*m (16 to 23 kgf*cm, 14 to 20 in.*lbf)
    for 5L
    1.5 to 2.2 N*m (15 to 22 kgf*cm, 13 to 19 in.*lbf)
    for 3 Door
    for 1KD and 2TR

    If the turning torque is not as specified, replace the steering gear assembly.

    HINT:
    1. Measure the standard preload at the steering rack neutral point.
    2. The steering control valve is fully turned when turned 3.0 times. Half of the distance from the fully turned position is the neutral point.

  1. After inspecting the preload, align the matchmarks.

← DISASSEMBLY (from Aug 2013)REASSEMBLY (from Aug 2013) →