2013-2015 Land Cruiser Prado · Service Manual Vehicle Exterior

INSTALLATION

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014

HINT:
  1. Use the same procedure for RHD and LHD vehicles.
  2. The procedure listed below is for LHD vehicles.


1. INSTALL HAZARD WARNING SIGNAL SWITCH ASSEMBLY (w/o Display)
  1. Attach the 4 claws to install the hazard warning signal switch assembly.


2. INSTALL HAZARD WARNING SIGNAL SWITCH ASSEMBLY (w/ Display)
  1. Attach the 2 claws to install the hazard warning signal switch assembly.

  1. Connect the connector.


3. INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY (w/o Display)
  1. Connect each connector.

  1. Attach the 10 clips to install the center instrument cluster finish panel.


4. INSTALL NAVIGATION RECEIVER ASSEMBLY (w/ Navigation System)

5. INSTALL INTEGRATION CONTROL AND PANEL ASSEMBLY
  1. Connect the connector.

  1. Attach the 4 clips to install the integration control and panel assembly.

← INSPECTION (from Aug 2013)INSTALLATION (from Aug 2014) →