When replacing the injector assemblies (including shuffling the injector assemblies between the cylinders), common rail assembly or cylinder head sub-assembly, it is necessary to replace the injection pipe sub-assemblies with new ones.
When replacing the fuel supply pump assembly, common rail assembly, cylinder block sub-assembly, cylinder head sub-assembly, cylinder head gasket or timing gear case assembly, it is necessary to replace the fuel inlet pipe sub-assembly with a new one.
After removing the injection pipe sub-assemblies and fuel inlet pipe sub-assembly, clean them with a brush and compressed air.
1.
DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL
NOTICE:
After turning the engine switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here).
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
Remove the 4 bolts, union bolt, gasket and No. 1 fuel pipe.
Text in Illustration
*1
No. 2 Fuel Pipe
-
-
Union Bolt
-
-
12.
REMOVE NO. 4 INJECTION PIPE SUB-ASSEMBLY
Remove the bolt, nut and 2 No. 2 injection pipe clamps.
Using a 17 mm union nut wrench, loosen the union nuts and remove the No. 4 injection pipe sub-assembly.
Text in Illustration
*a
Common Rail Assembly Side
*b
Injector Assembly Side
13.
REMOVE NO. 2 FUEL PIPE
Using a 6 mm hexagon wrench, remove the union bolt and gasket.
Text in Illustration
Union Bolt
Fuel Check Valve
Bolt
Remove the fuel check valve and gasket.
Remove the bolt and No. 2 fuel pipe.
14.
REMOVE NO. 3 NOZZLE LEAKAGE PIPE
Disconnect the 2 fuel hoses.
Text in Illustration
Fuel Check Valve
Remove the 2 bolts.
Remove the fuel check valve, gasket and No. 3 nozzle leakage pipe.
15.
REMOVE NO. 2 NOZZLE LEAKAGE PIPE ASSEMBLY
Remove the 2 bolts.
Text in Illustration
Union Bolt
Remove the union bolt, gasket and No. 2 nozzle leakage pipe assembly.
16.
REMOVE NO. 2 CYLINDER HEAD COVER SUB-ASSEMBLY
Remove the 4 bolts and No. 2 cylinder head cover sub-assembly.
17.
REMOVE VENTILATION PIPE
Type A Slide the 2 clamps and disconnect the No. 3 turbo water hose and No. 4 turbo water hose from the ventilation pipe.
Remove the bolt and disconnect the 2 ventilation hoses and ventilation pipe from the cylinder head sub-assembly.
Text in Illustration
*A
Type A
*B
Type B
18.
REMOVE CYLINDER HEAD COVER SUB-ASSEMBLY
NOTICE:
If the cylinder head cover sub-assembly is removed, replace the 4 No. 3 cylinder head cover gaskets with new ones.
Using a small screwdriver, remove the nozzle holder seal by prying the portion between the nozzle holder seal and the cutout part of the cylinder head cover sub-assembly.
Remove the 10 bolts, 2 nuts, cylinder head cover sub-assembly and cylinder head cover gasket.
Remove the 4 No. 3 cylinder head cover gaskets from the cylinder head cover sub-assembly.
19.
REMOVE INJECTOR ASSEMBLY
Remove the union bolt, 4 injector hollow screws, 5 gaskets and nozzle leakage pipe assembly.
Text in Illustration
*1
Union Bolt
NOTICE:
When removing the nozzle leakage pipe assembly, place a cushion under the pipe.
Be careful not to deform or scratch the union seal surface.
After removing the nozzle leakage pipe assembly, put it in a plastic bag to prevent foreign matter from contaminating its injector inlet.
Remove the 4 bolts, 4 washers, 4 No. 1 nozzle holder clamps and 4 injector assemblies.
HINT:
Arrange the injectors, No. 1 nozzle holder clamps, washers and bolts in the correct order.
Remove the O-ring from each injector assembly.
Remove the 4 injection nozzle seats from the cylinder head sub-assembly.