Home › Engine / Hybrid System › 1GR-FE (EMISSION CONTROL) › AIR SWITCHING VALVE (for Bank 1)
RM27T0E _51 Engine / Hybrid System _053672 1GR-FE EMISSION CONTROL _0260603 AIR SWITCHING VALVE(for Bank 1) A

1GR-FE EMISSION CONTROL  AIR SWITCHING VALVE(for Bank 1)  INSTALLATION  


PROCEDURE

Hide 25701 1.INSTALL EMISSION CONTROL VALVE SET

a.

Install the emission control valve set with the 3 nuts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.
A224702C02
0.698,0.177 0.802,0.177 0.802,0.177 1.042,0.719 true 1.635,1.042 1.573,1.042 1.573,1.042 1.292,0.75 false 3.01,0.125 3.188,0.302 0.177,0.177 10 false *a 2.042,0.688 2.219,0.865 0.177,0.177 10 false *b 0.521,0.104 0.698,0.281 0.177,0.177 10 false *1 1.656,0.979 1.833,1.156 0.177,0.177 10 false *2 2.167,0.927 2.427,1.073 0.26,0.146 10 false 60°

Align the paint mark with the projection and connect the No. 1 air hose.

Text in Illustration
*1 Rib
*2 Paint mark
*a RH Side
*b Upper

HINT:

Make sure the direction of the hose clamp is as shown in the illustration.



c.

Connect the emission control valve set connector.


Hide 17361 2.INSTALL AIR TUBE

a.
A226791C02
2.604,1.01 2.531,1.01 2.531,1.01 2.448,0.885 false 2.969,0.885 2.906,0.885 2.906,0.885 2.844,0.698 false 2.625,0.948 2.792,1.104 0.167,0.156 10 false *1 2.99,0.802 3.156,0.958 0.167,0.156 10 false *2

Install 2 new gaskets to the air tube.

Text in Illustration
*1 New Gasket
*2 Air Tube


b.

Install the air tube with the 2 bolts and 2 nuts.

Torque:
10 N*m (102 kgf*cm, 7 in.*lbf)


Hide 3.CONNECT WATER HOSE JOINT

a.

Connect the water hose joint with the bolt.

Torque:
5.4 N*m (55 kgf*cm, 48 in.*lbf)


Hide 4.INSTALL AIR CLEANER CASE SUB-ASSEMBLY

a.

Install the air cleaner case with the 3 bolts.

Torque:
12 N*m (122 kgf*cm, 9 ft.*lbf)


b.

Attach the wire harness clamp.


c.

Install the air cleaner filter element.