Home › Engine / Hybrid System › 1GD-FTV (EMISSION CONTROL) › EGR VALVE › 2017.08–2018.06
RM27T0E _51 Engine / Hybrid System _053675 1GD-FTV EMISSION CONTROL _0260627 EGR VALVE A

1GD-FTV EMISSION CONTROL  EGR VALVE  INSTALLATION  


PROCEDURE

Hide 25630 1.INSTALL NO. 2 EGR VALVE ASSEMBLY

a.

Using an E8 "TORX" socket wrench, install the 2 stud bolts to the No. 2 EGR valve assembly.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


b.

Install a new gasket and the No. 2 EGR valve assembly to the No. 1 EGR cooler with the 4 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


Hide 25624 2.INSTALL EGR VALVE ADAPTER

a.

Install a new gasket and the EGR valve adapter to the No. 2 EGR valve assembly with the 2 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


Hide 3.INSTALL NO. 1 EGR COOLER WITH NO. 2 EGR VALVE ASSEMBLY

a.

Temporarily install a new gasket and the No. 1 EGR cooler with No. 2 EGR valve assembly to the intake manifold with the 4 bolts.


b.

Using an E8 "TORX" socket wrench, install the 2 stud bolts to the No. 2 EGR valve assembly.

Torque:
5.0 N*m (51 kgf*cm, 44 in.*lbf)


c.
A454585N01
0.531,0.323 0.667,0.49 0.135,0.167 10 true 4 0.792,1.906 0.927,2.073 0.135,0.167 10 true 1 2.198,1.938 2.333,2.104 0.135,0.167 10 true 2 3.229,1.458 3.365,1.625 0.135,0.167 10 true 3

Tighten the 4 bolts in the order shown in the illustration.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)

NOTICE:

Make sure to tighten the bolts in the order.



Hide 25601 5.CONNECT NO. 1 EGR PIPE SUB-ASSEMBLY

a.

Install 2 new gaskets and connect the No. 1 EGR pipe sub-assembly to the EGR valve adapter with 2 new nuts.

Torque:
29 N*m (296 kgf*cm, 21 ft.*lbf)


Hide 16209 6.CONNECT NO. 4 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Connect the No. 4 water by-pass pipe sub-assembly to the intake manifold with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the water hose to the No. 2 EGR valve assembly, and slide the clamp to secure the hose.


c.

Connect the No. 7 water by-pass hose to the No. 1 EGR cooler, and slide the clamp to secure the hose.


Hide 16206B 7.INSTALL NO. 3 WATER BY-PASS PIPE SUB-ASSEMBLY

a.

Install the No. 3 water by-pass pipe sub-assembly to the No. 1 EGR cooler with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 8 water by-pass hose to the No. 3 water by-pass pipe sub-assembly, and slide the clamp to secure the hose.


c.

Connect the No. 4 fuel hose to the No. 3 water by-pass pipe sub-assembly.


Hide 25800 8.INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY

a.

Install a new gasket and the electric EGR control valve assembly to the No. 2 EGR valve assembly with the 2 bolts.

Torque:
25 N*m (255 kgf*cm, 18 ft.*lbf)


b.

Connect the No. 9 water by-pass hose to the electric EGR control valve assembly, and slide the clamp to secure the hose.


c.

Attach the clamp and connect the connector to the common rail assembly.


Hide 25612 9.INSTALL NO. 2 EGR PIPE

a.

Install 2 new gaskets and No. 2 EGR pipe to the electric EGR control valve assembly and the intake manifold with the 4 nuts.

Torque:
29 N*m (296 kgf*cm, 21 ft.*lbf)


b.

Attach the 6 clamps and connect the engine room main wire.


Hide 25625 10.INSTALL EGR VALVE BRACKET

a.

Install the EGR valve bracket to the electric EGR control valve assembly and intake manifold with the bolt and nut.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 82121 11.CONNECT ENGINE WIRE

a.

Connect the 2 connectors to the vacuum control valve sets.


b.

Attach the clamp and install the bolt.

Torque:
13 N*m (133 kgf*cm, 9 ft.*lbf)


c.

Attach the clamp and connect the 2 connectors to the vane pump assembly.


d.

Attach the clamp and install the bolt.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


e.

Connect the connector to the sensor wire of the common rail assembly.


f.

Connect the connector to the glow plug connector.


g.

Connect the connector to the electric EGR control valve assembly.


h.

Connect the 4 connectors to the 4 injector assemblies.


i.

Connect the connector to the camshaft position sensor.


j.

Connect the connector to the exhaust fuel addition injector assembly.


k.

Connect the 3 connectors to the 3 exhaust gas temperature sensors.


l.

Connect the connector to the differential pressure sensor.


m.

Attach the 2 clamps and connect the 2 connectors to the turbocharger sub-assembly.


Hide 44306 12.CONNECT VANE PUMP OIL RESERVOIR SUB-ASSEMBLY

a.

Connect the vane pump oil reservoir sub-assembly to the body with the 3 bolts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 77820 13.CONNECT UREA TANK FILLER PIPE ASSEMBLY (w/ Urea SCR System)

a.
A409329C01
2.49,1.583 2.719,1.854 2.719,1.854 2.885,1.854 true 1.323,1.906 0.729,1.615 0.729,1.615 0.521,1.615 true 0.344,1.51 0.594,1.688 0.25,0.177 10 false *a 2.917,1.76 3.167,1.938 0.25,0.177 10 false *b
*a Protrusion
*b Keyway


Align the protrusion of the urea tank filler pipe assembly to the keyway of the No. 1 oil reservoir bracket assembly.


b.

Connect the urea tank filler pipe assembly to the No. 1 oil reservoir bracket assembly with the 2 bolts.

Torque:
13.5 N*m (138 kgf*cm, 10 ft.*lbf)


Hide 12632 14.INSTALL NO. 2 ENGINE COVER BRACKET

a.

Install the No. 2 engine cover bracket to the No. 3 water by-pass pipe sub-assembly and No. 2 EGR valve assembly with the 2 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


Hide 12633 15.INSTALL NO. 3 ENGINE COVER BRACKET

a.

Install the No. 3 engine cover bracket to the engine cover bracket and No. 2 engine cover bracket with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 89421C 16.INSTALL DIESEL TURBO PRESSURE SENSOR

a.

Install the diesel turbo pressure sensor to the No. 3 water by-pass pipe sub-assembly with the bolt.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the connector to the diesel turbo pressure sensor.


Hide 23265C 17.INSTALL GAS FILTER

a.

Install the gas filter to the gas filter bracket.


b.

Connect the 2 vacuum hoses to the turbo pressure sensor and intake manifold.


Hide 16278 18.INSTALL NO. 2 WATER BY-PASS PIPE

a.

Install the No. 2 water by-pass pipe to the cylinder head cover sub-assembly, No. 3 water by-pass pipe sub-assembly and No. 2 engine cover bracket with the 3 bolts.

Torque:
10 N*m (102 kgf*cm, 7 ft.*lbf)


b.

Connect the No. 16 water by-pass hose to the No. 1 EGR cooler, and slide the clamp to secure the hose.


c.

Connect the No. 15 water by-pass hose to the water by-pass pipe, and slide the clamp to secure the hose.


d.

Connect the No. 13 water by-pass hose to the water outlet sub-assembly, and slide the clamp to secure the hose.


Hide 87209 19.INSTALL WATER HOSE SUB-ASSEMBLY

a.

Connect the 2 water hose sub-assemblies to the No. 2 water pipe, and slide the clamp to secure the hoses.


b.

Connect the 2 water hose sub-assemblies to the air conditioning unit assembly, and slide the clamp to secure the hoses.


c.

w/ Rear Air Conditioning System:

Connect the 2 water hose sub-assemblies to the water pipe, and slide the clamp to secure the hoses.


Hide 26100G 20.INSTALL DIESEL THROTTLE BODY ASSEMBLY