Home › Engine / Hybrid System › 1GD-FTV (EMISSION CONTROL) › UREA TANK › 2017.08–2021.06
RM27T0E _51 Engine / Hybrid System _053675 1GD-FTV EMISSION CONTROL _0260632 UREA TANK A

1GD-FTV EMISSION CONTROL  UREA TANK  INSTALLATION  


PROCEDURE

Hide 77862 1.INSTALL NO. 2 UREA TANK BRACKET

a.

Install the No. 2 urea tank bracket to the urea tank sub-assembly with the bolt.

Torque:
14.3 N*m (146 kgf*cm, 11 ft.*lbf)


Hide 77861 2.INSTALL NO. 1 UREA TANK BRACKET

a.

Install the No. 1 urea tank bracket to the urea tank sub-assembly with the bolt.

Torque:
14.3 N*m (146 kgf*cm, 11 ft.*lbf)


Hide 77871 3.INSTALL UREA PUMP

a.

Install a new gasket to the urea tank sub-assembly.


b.
A460327C02
2.99,0.208 2.865,0.208 2.865,0.208 2.708,0.969 true 3.021,0.115 3.333,0.313 0.313,0.198 10 false *a
*a Matchmark


Install the urea pump to the urea tank sub-assembly as shown in the illustration.


c.
A460328C01
2.125,1.51 2.75,1.208 2.75,1.208 2.917,1.208 true 2.948,1.125 3.177,1.271 0.229,0.146 10 true *a
*a Co-rotation Prevention Check Mark


Apply a co-rotation prevention check mark to the urea pump.

HINT:

Perform this procedure when replacement of the urea pump is necessary.



d.
A460329C01
2.385,1.031 2.813,0.219 2.813,0.219 2.979,0.219 true 2.625,1.01 2.792,1.365 2.792,1.365 2.958,1.365 true 3.01,0.135 3.24,0.292 0.229,0.156 10 true *a 2.99,1.313 3.219,1.479 0.229,0.167 10 true *b
*a Rotational Start Point Mark (Urea Pump Gauge Retainer Side)
*b Rotational Start Point Mark (Urea Tank Sub-assembly Side)


Temporarily place the urea pump gauge retainer by aligning the rotational start point mark of the urea pump gauge retainer with the rotational start point mark of the urea tank sub-assembly.


e.
A412502C01
0.375,3.531 0.5,3.531 0.5,3.531 0.729,3.823 true 0.708,0.688 0.938,0.688 true 1.156,1 1.635,1 true 1.135,2.875 1.271,2.875 1.271,2.875 1.573,2.635 true 1.01,2.094 1.146,2.094 1.146,2.094 1.573,2.438 true 1.688,0.938 1.927,1.083 0.24,0.146 10 false *1 0.5,0.615 0.698,0.771 0.198,0.156 10 false *a 0.948,2.813 1.156,2.969 0.208,0.156 10 false *b 0.813,2.021 1.021,2.188 0.208,0.167 10 false *c 0.188,3.469 0.385,3.604 0.198,0.135 10 false *d
*1 Urea Pump Gauge Retainer
*a SST (Claw Set)
*b Rib
*c Cutout
*d SST (Claw Set) Incorrect Installation Point (Rotational Start Point Mark of Urea pump Gauge Retainer)


Set 4 SST (claw sets) to the urea pump gauge retainer and temporarily install.

SST
09808-14031  (09808-01080, 09808-01090, 09808-01100)

NOTICE:
·

Align the cutout of SST (claw set) to the rib of the urea pump gauge retainer.

·

Do not place SST on the rotational start paint mark of the urea pump gauge retainer, otherwise SST (claw set) cannot be set correctly.




f.
A412503C01
2.094,1.427 2.479,0.969 2.479,0.969 2.708,0.969 true 1.375,1.063 0.813,0.875 0.813,0.875 0.656,0.875 false 1.094,1.833 0.677,1.99 0.677,1.99 0.521,1.99 true 2.76,0.906 2.99,1.073 0.229,0.167 10 false *1 0.448,0.813 0.656,0.958 0.208,0.146 10 false *a 0.333,1.917 0.552,2.073 0.219,0.156 10 false *b
*1 Urea Pump Gauge Retainer
*a SST (Claw Set)
*b Hook
V100135

Pinch
V100136

SST (Bolt)


While firmly pressing the claw of SST into rib of the urea pump gauge retainer, tighten the bolt.


g.
A460322C01
1.031,0.427 0.656,0.25 0.656,0.25 0.49,0.25 true 2.094,1.479 2.646,1.354 2.646,1.354 2.833,1.354 true 0.292,0.167 0.521,0.354 0.229,0.188 10 false *a 2.875,1.271 3.104,1.458 0.229,0.188 10 false *b
*a SST (Plate)
*b SST (Claw Set)
V100135

SST (Bolt)


Temporarily install SST (plate) to SST (claw set) with 4 SST (bolts).

SST
09808-14031  (09808-01030, 09808-01090)


h.
A460323C01
2.052,1.417 2.823,1.417 true 1.802,1.188 0.885,0.896 0.885,0.896 0.719,0.896 true 0.531,0.813 0.76,0.979 0.229,0.167 10 false *a 2.865,1.344 3.094,1.51 0.229,0.167 10 false *b
*a Center of Urea Pump Gauge Retainer
*b SST (Plate)


Adjust the position of SST (plate) so that the setting hole of SST (handle) aligns with the center of the urea pump gauge retainer.


i.
A460324C01
2.25,0.188 2.01,0.188 2.01,0.188 1.042,0.354 true 1.26,2.677 1.031,2.365 1.031,2.365 0.875,2.365 true 1.75,2.281 2.344,2.281 true 2.302,0.813 2.063,0.813 2.063,0.813 1.229,0.542 true 2.198,3.25 2.052,3.25 2.052,3.25 1.656,2.885 true 2.281,0.104 2.521,0.281 0.24,0.177 10 true *a 2.385,2.208 2.583,2.354 0.198,0.146 10 false *b 2.344,0.719 2.583,0.896 0.24,0.177 10 false *c 2.229,3.156 2.438,3.323 0.208,0.167 10 false *d 0.698,2.281 0.938,2.458 0.24,0.177 10 false *1
*1 Urea Pump Gauge Retainer
*a SST (Plate)
*b SST (Claw Set)
*c SST (Bolt)
*d Rib
V113147

Press


While firmly pressing SST (claw set) into rib of the urea pump gauge retainer, tighten SST (bolt).


j.
A460330C01
2.115,1.5 2.875,1.5 true 2.302,1.688 2.531,1.688 2.531,1.688 2.531,1.51 true 2.5,1.021 2.802,0.208 2.802,0.208 2.948,0.208 true 2.969,0.135 3.281,0.292 0.313,0.156 10 true *a 2.906,1.438 3.219,1.594 0.313,0.156 10 true *b
*a Tighten Start Position
*b Co-rotation Prevention Check Mark


While one person presses the urea pump into the urea tank sub-assembly, have another person firmly press the urea pump gauge retainer into the threads of the urea tank assembly and tighten approximately one turn.

NOTICE:
·

Do not any tools other than SST, such as a screwdriver, etc.

·

Do not apply excessive force when pressing down on SST, as the urea pump will place excessive force on urea pump gauge retainer and be difficult to remove, and parts may be damaged.

·

Do not use an impact wrench or turn SST handle with excessive force, as parts may be damaged.

·

Do not rotate the urea pump gauge retainer when the co-rotation prevention check mark is out of place.




k.
A460331C01
1.708,0.771 1.344,0.177 1.344,0.177 1.146,0.177 true 0.958,0.094 1.167,0.271 0.208,0.177 10 false *a 0.344,0.729 0.552,0.885 0.208,0.156 10 false *b 2.854,0.49 3.073,0.656 0.219,0.167 10 true *c 2.438,1.604 2.646,1.76 0.208,0.156 10 false *b 2.01,0.083 2.229,0.25 0.219,0.167 10 true *c
*a SST (Plate)
*b Person in Change of Tightening
*c Person in Charge of Supporting


While one person presses the urea pump into the urea tank sub-assembly, have another person slowly tighten it.


l.
A460332C01
1.073,0.875 1.375,0.552 1.375,0.552 1.542,0.552 false 1.313,1.76 0.646,1.896 0.646,1.896 0.469,1.896 true 1.74,3.365 2.365,3.135 2.365,3.135 2.479,3.135 true 1.573,0.469 1.885,0.625 0.313,0.156 10 false *a 0.292,1.813 0.604,1.969 0.313,0.156 10 false *b 2.115,0.635 2.427,0.792 0.313,0.156 10 false *c 0.104,0.771 0.354,0.938 0.25,0.167 10 true *d 2.5,3.052 2.74,3.208 0.24,0.156 10 false *e 2.875,1.125 3.188,1.281 0.313,0.156 10 false *c 2.688,2.406 3,2.563 0.313,0.156 10 true *d 1.646,4.104 1.885,4.26 0.24,0.156 10 false A
*a SST (Handle)
*b SST (Plate)
*c Person in Charge of Supporting
*d Person in Charge of Tightening
*e Rotational Start Point Mark of Urea Pump Gauge Retainer
V113147

Tighten


Install SST (handle) to SST (plate).

SST
09808-14031  (09808-01010, 09808-01020)


m.

While one person presses the urea pump onto the urea tank sub-assembly, have another person use SST (handle) and slowly tighten the urea pump gauge retainer is within range A on the urea tank sub-assembly as shown in the illustration.


Hide 77840 4.INSTALL UREA TUBE WITH HEATER ASSEMBLY

NOTICE:

Check for dirt or mud on the urea pump and around the urea tube with heater connector before connection. Clean if necessary.


a.

Install the urea tube with heater assembly to the urea pump.

HINT:

If there is any solidified urea solution (white solids) on the connection areas of the urea tube with heater assembly and urea pump, clean the solids off with water. Otherwise, they may prevent the O-ring from sealing properly.


i.

Wash the connection area of the urea tube with heater connector with water to remove all solidified urea solution (white solids).


ii.

Wipe off the connection area of the urea pump with water to remove all solidified urea solution (white solids).


iii.
A409326C01
1.813,1.229 0.896,1.823 0.896,1.823 0.646,1.823 true 0.469,1.719 0.688,1.917 0.219,0.198 10 false *a
*a Retainer
V100135

Push
V100136

Push Down


Align the axis of the connector with the axis of the urea injector set. Push the urea tube with heater connector into the urea pump until the urea tube with heater connector makes a "click" sound.


iv.

Push down the retainer.


v.

After connecting the urea pump and the urea tube with heater connector, check that the urea pump and urea tube with heater connector are securely connected by trying to pull them apart.



Hide 77903 5.INSTALL UREA TANK BREATHER TUBE SUB-ASSEMBLY

NOTICE:

Check for dirt or mud on the urea tank sub-assembly and around the urea tank breather tube connector before connection. Clean if necessary.


a.

Attach the clamp and install the urea tank breather tube sub-assembly to the urea tank sub-assembly.

HINT:

If there is any solidified urea solution (white solids) on the connection areas of the urea tank breather tube sub-assembly and urea tank sub-assembly, clean the solids off with water. Otherwise, they may prevent the O-ring from sealing properly.


i.

Wash the connection area of the urea tank breather tube connector with water to remove all solidified urea solution (white solids).


ii.

Wipe off the connection area of the urea tank sub-assembly with water to remove all solidified urea solution (white solids).


iii.
A409316C01
2.167,0.708 1.917,0.385 1.917,0.385 1.76,0.385 true 1.583,0.292 1.896,0.49 0.313,0.198 10 false *a
*a Retainer
V100135

Push
V100136

Push Down


Align the axis of the connector with the axis of the urea tank sub-assembly. Push the urea tank breather tube connector into the urea tank sub-assembly until the urea tank breather tube connector makes a "click" sound.


iv.

Push down the retainer.


v.

After connecting the urea tank sub-assembly and the urea tank breather tube connector, check that the urea tank sub-assembly and urea tank breather tube connector are securely connected by trying to pull them apart.



Hide 77801 6.INSTALL UREA TANK SUB-ASSEMBLY

a.

Install the urea tank sub-assembly to the frame LH with the 2 bolts.

Torque:
14.3 N*m (146 kgf*cm, 11 ft.*lbf)


Hide 77900 7.CONNECT UREA TANK FILLER PIPE WITH SUPPORT ASSEMBLY

NOTICE:

Check for dirt or mud on the urea tank breather tube sub-assembly, urea tank sub-assembly and around the urea tank filler pipe with support connector before connection. Clean if necessary.


a.

Connect the urea tank filler pipe with support assembly to the urea tank breather tube sub-assembly.

HINT:

If there is any solidified urea solution (white solids) on the connection areas of the urea tank filler pipe with support assembly and urea tank breather tube sub-assembly, clean the solids off with water. Otherwise, they may prevent the O-ring from sealing properly.


i.

Wash the connection area of the urea tank filler pipe with support connector with water to remove all solidified urea solution (white solids).


ii.

Wipe off the connection area of the urea tank breather tube sub-assembly with water to remove all solidified urea solution (white solids).


iii.
A409318C01
2.104,1.417 1.479,1.844 1.479,1.844 1.271,1.844 true 1.094,1.75 1.406,1.948 0.313,0.198 10 false *a
*a Retainer
V100135

Push
V100136

Push Down


Align the axis of the connector with the axis of the urea tank breather tube sub-assembly. Push the urea tank filler pipe with support connector into the urea tank breather tube sub-assembly until the urea tank filler pipe with support connector makes a "click" sound.


iv.

Push down the retainer.


v.

After connecting the urea tank breather tube sub-assembly and the urea tank filler pipe with support connector, check that the urea tank breather tube sub-assembly and urea tank filler pipe with support connector are securely connected by trying to pull them apart.



b.

Connect the urea tank filler pipe with support assembly to the urea tank sub-assembly.

HINT:

If there is any solidified urea solution (white solids) on the connection areas of the urea tank filler pipe with support assembly and urea tank sub-assembly, clean the solids off with water. Otherwise, they may prevent the O-ring from sealing properly.


i.

Wash the connection area of the urea tank filler pipe with support connector with water to remove all solidified urea solution (white solids).


ii.

Wipe off the connection area of the urea tank sub-assembly with water to remove all solidified urea solution (white solids).


iii.
A409317C01
1.479,0.5 2.052,0.25 2.052,0.25 2.229,0.25 true 2.25,0.146 2.563,0.344 0.313,0.198 10 true *a
*a Retainer
V100135

Push
V100136

Push Down


Align the axis of the connector with the axis of the urea tank sub-assembly. Push the urea tank filler pipe with support connector into the urea tank sub-assembly until the urea tank filler pipe with support connector makes a "click" sound.


iv.

Push down the retainer.


v.

After connecting the urea tank sub-assembly and the urea tank filler pipe with support connector, check that the urea tank sub-assembly and urea tank filler pipe with support connector are securely connected by trying to pull them apart.



Hide 77840 8.CONNECT UREA TUBE WITH HEATER ASSEMBLY

a.

Attach the 4 clamps and connect the urea tube with heater assembly to the frame crossmember and urea tank sub-assembly.


b.

Connect the urea tube with heater assembly to the urea injector set (See page Engine / Hybrid System>1GD-FTV (EMISSION CONTROL)>UREA INJECTOR>INSTALLATION).


Hide 82169 9.CONNECT NO. 3 FRAME WIRE

a.
A409319

Connect the connector to the urea pump as shown in the illustration.


b.

Attach the clamp to the urea pump.


c.

Connect the connector to the urea tube with heater assembly.


Hide 53737A 10.INSTALL NO. 1 FRONT FENDER APRON TO FRAME SEAL LH

a.

Install the No. 1 front fender apron to frame seal LH to the body with the 5 clips.


Hide 35000 11.INSTALL AUTOMATIC TRANSMISSION ASSEMBLY (for Automatic Transmission)

Hide 33030 12.INSTALL MANUAL TRANSMISSION UNIT ASSEMBLY (for Manual Transmission)