Home › Steering › POWER ASSIST SYSTEMS › VANE PUMP (for 2TR-FE) › from 2020.08
RM27T0E _55 Steering _053717 POWER ASSIST SYSTEMS _0260948 VANE PUMP(for 2TR-FE) A

POWER ASSIST SYSTEMS  VANE PUMP(for 2TR-FE)  INSTALLATION  


PROCEDURE

Hide 44310 1.INSTALL VANE PUMP ASSEMBLY (w/ VSC)

a.

Install the vane pump with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


Hide 44310 2.INSTALL VANE PUMP ASSEMBLY (w/o VSC)

a.

Install the vane pump with the 2 bolts.

Torque:
21 N*m (214 kgf*cm, 15 ft.*lbf)


b.

Connect the connector to the oil pressure switch.


Hide 44410 3.CONNECT PRESSURE FEED TUBE ASSEMBLY (w/ VSC)

a.

Install a new gasket and the pressure feed tube to the vane pump with the union bolt.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)

HINT:

Make sure the stopper of the pressure feed tube touches the vane pump.



b.

Connect the 2 connectors.


Hide 44410 4.CONNECT PRESSURE FEED TUBE ASSEMBLY (w/o VSC)

a.

Install a new gasket and the pressure feed tube to the vane pump with the union bolt.

Torque:
50 N*m (510 kgf*cm, 37 ft.*lbf)

HINT:

Make sure the stopper of the pressure feed tube touches the vane pump.



Hide 44412 5.CONNECT RETURN HOSE

a.

Connect the hose with the clip.


Hide 7.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

Hide 8.ADD POWER STEERING FLUID

Hide 10.INSPECT FOR POWER STEERING FLUID LEAK

Hide 11. INITIALIZATION AFTER RECONNECTING BATTERY TERMINAL

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>WORK PROCEDURE

HINT:

When disconnecting and reconnecting the battery, there is an automatic learning function that completes learning when the respective system is used.

Click hereGeneral>SETUP>WHEN DISCONNECTING OR RECONNECTING BATTERY TERMINAL>AUTOMATIC LEARNING CHART