2011-2013 Land Cruiser · Service Manual Engine / Hybrid / EV System

REPLACEMENT

Removal / installation · Vehicles built from Jan 2012

Versions by build date: Sep 2011 – Dec 2011 from Jan 2012


1. REPLACE INTAKE VALVE GUIDE BUSH
  1. Heat the cylinder head to 80 to 100°C (176 to 212°F).

  1. Place the cylinder head on wooden blocks.

  1. A222129E01
    Using SST and a hammer, tap out the intake valve guide bushes.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

  1. Using a caliper gauge, measure the intake valve guide bush bore diameter of the cylinder head.

    Standard Bush Bore Diameter:
    Item
    Specified Condition
    STD
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    O/S 0.05
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)

  1. Select a new valve guide bush.

    New Guide Bush:
    Item
    Specified Condition
    Bush Bore Diameter
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)
    Use Bush
    STD
    O/S 0.05

    If the bush bore diameter of the cylinder head is more than 10.306 mm (0.4057 in.), machine the bush bore diameter to 10.335 to 10.356 mm (0.4069 to 0.4077 in.) to install an O/S 0.05 valve guide bush.
    If the bush bore diameter of the cylinder head is more than 10.356 mm (0.4077 in.), replace the cylinder head.

    New Guide Bush Diameter:
    Item
    Specified Condition
    STD
    10.333 to 10.344 mm (0.4068 to 0.4072 in.)
    O/S 0.05
    10.383 to 10.394 mm (0.4088 to 0.4092 in.)

    HINT:
    Different bushes are used for the intake and exhaust.

    Standard bush length:
    41.3 to 41.7 mm (1.63 to 1.64 in.)

  1. Heat the cylinder head to 80 to 100°C (176 to 212°F).

  1. Place the cylinder head on wooden blocks.

  1. A221110E01
    Using SST, tap in the intake valve guide bushes to the specified protrusion height.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

    Standard protrusion height:
    9.10 to 9.90 mm (0.358 to 0.390 in.)

    Text in Illustration 
    *1
    Protrusion Height

  1. A131839
    Using a sharp 5.5 mm reamer, ream the valve guide bushes to obtain the specified clearance.

    Standard oil clearance:
    0.025 to 0.060 mm (0.000984 to 0.00236 in.)


2. REPLACE EXHAUST VALVE GUIDE BUSH
  1. Heat the cylinder head to 80 to 100°C (176 to 212°F).

  1. Place the cylinder head on wooden blocks.

  1. A222130E01
    Using SST and a hammer, tap out the exhaust valve guide bushes.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

  1. Using a caliper gauge, measure the exhaust valve guide bush bore diameter of the cylinder head.

    Standard Bush Bore Diameter:
    Item
    Specified Condition
    STD
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    O/S 0.05
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)

  1. Select a new valve guide bush.

    New Guide Bush:
    Item
    Specified Condition
    Bush Bore Diameter
    10.285 to 10.306 mm (0.4049 to 0.4057 in.)
    10.335 to 10.356 mm (0.4069 to 0.4077 in.)
    Use Bush
    STD
    O/S 0.05

    If the bush bore diameter of the cylinder head is more than 10.306 mm (0.4057 in.), machine the bush bore diameter to 10.335 to 10.356 mm (0.4069 to 0.4077 in.) to install an O/S 0.05 valve guide bush.
    If the bush bore diameter of the cylinder head is more than 10.356 mm (0.4077 in.), replace the cylinder head.

    New Guide Bush Diameter:
    Item
    Specified Condition
    STD
    10.333 to 10.344 mm (0.4068 to 0.4072 in.)
    O/S 0.05
    10.383 to 10.394 mm (0.4088 to 0.4092 in.)

    HINT:
    Different bushes are used for the intake and exhaust.

    Standard bush length:
    46.8 to 47.2 mm (1.84 to 1.86 in.)

  1. Heat the cylinder head to 80 to 100°C (176 to 212°F).

  1. Place the cylinder head on wooden blocks.

  1. A221111E01
    Using SST, tap in the exhaust valve guide bushes to the specified protrusion height.
    SST
    09201-10000   (09201-01050)
    09950-70010   (09951-07100)

    Standard protrusion height:
    9.10 to 9.90 mm (0.358 to 0.390 in.)

    Text in Illustration 
    *1
    Protrusion Height

  1. A096429
    Using a sharp 5.5 mm reamer, ream the valve guide bushes to obtain the specified clearance.

    Standard oil clearance:
    0.030 to 0.065 mm (0.00118 to 0.00256 in.)


3. REPLACE STRAIGHT PIN

NOTICE:
If a straight pin is deformed, replace it.

  1. Using a plastic-faced hammer, tap in new straight pins as shown in the illustration.

    A221114E03

    Text in Illustration 
    *1
    Protrusion Height
    -
    -
    *a
    RH
    *b
    LH

    Standard protrusion height:
    18.0 to 19.0 mm (0.708 to 0.748 in.)


4. REPLACE RING PIN

NOTICE:
It is not necessary to remove a ring pin unless it is being replaced.

  1. A221112E03
    Using a plastic-faced hammer, tap in new ring pins to the specified protrusion height.

    Standard protrusion height:
    2.5 to 3.5 mm (0.0984 to 0.138 in.)

    Text in Illustration 
    *1
    Protrusion Height
    *a
    RH
    *b
    LH


5. REPLACE SPARK PLUG TUBE

A223702E01

HINT:
When using a new cylinder head, the spark plug tubes must be replaced.

  1. Apply adhesive to the end of a new spark plug tube.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent.

    Standard seal diameter:
    1.0 to 3.0 mm (0.394 to 0.118 in.)

    Distance:
    9.0 to 15.0 mm (0.354 to 0.590 in.)

    Text in Illustration 
    *1
    Adhesive
    *2
    Distance

    NOTICE:
    1. Be careful not to deform the spark plug tube.
    2. Be careful not to expose the seal to coolant for at least 1 hour after installing it.

  1. A223701E01
    Using a wooden block and hammer, tap in the spark plug tube to the specified protrusion height.

    Standard protrusion height:
    75.1 to 76.1 mm (2.96 to 3.00 in.)

    Text in Illustration 
    *1
    Cylinder Head Top Surface
    *2
    Protrusion Height

    NOTICE:
    To avoid tapping in the spark plug tube too far, measure the protrusion height while tapping it.

← REPLACEMENT (Sep 2011 – Dec 2011)REASSEMBLY (Sep 2011 – Dec 2011) →